Net Metering Policy Updated On Mon, Nov 12th, 2018 by Saurenergy A light to shine your Today’s with power and tomorrow’s with brightening bank balances. “Bank your Electricity, Bank your Money Adopt Roof Top Net Metering” Information Guide: FOR INSTALLATION OF ROOF TOP SOLAR PV POWER PLANTS UNDER NET METERING POLICY IN PUNJAB WHAT IS NET METERING ? Net metering is the process through which you […] Read more
SECI Auction for Maharashtra Park put off Indefinitely Updated On Mon, Nov 5th, 2018 by Saurenergy BENGALURU: Developers’ interest in Solar Energy Corporation of India’s (SECI) auctions hit a nadir when Tata Power Renewable Energy was the sole bidder on Wednesday for an auction for 50 MW at Dhodhainicha Solar Park in Maharashtra. The auction has been put off indefinitely. Last week SECI postponed a 1200 MW hybrid auction – solar […] Read more
Smart Meters in Rural India a Win-Win Soln for All: ADB Updated On Mon, Oct 29th, 2018 by Saurenergy ADB decided to support a USD 200 million loan for Energy Efficiency Services Limited (EESL) to implement various demand-side energy efficiency projects in India. International development finance institution Asian Development Bank (ADB) is mulling to scale up satellite communication technology based smart meters projects as it finds it to be a win-win solution for various stakeholders, including […] Read more
Low-ceiling tariff by SECI gets auction postponed again for 1200 MW Hybrid Tender Updated On Mon, Oct 29th, 2018 by Saurenergy The main reason was poor response from developers, who claimed to have stayed away mainly because SECI had set a tariff ceiling for the auction at Rs 2.60 per unit, which developers felt was too low. The auction, which was to be held on October 26, is now set for November 14. SECI has postponed its […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
US Wind Turbine Market to be Driven by Decarbonization Targets and Favorable Regulatory Directives Updated On Fri, Oct 26th, 2018 by Saurenergy Global wind turbine market players recently witnessed a path-breaking announcement by energy giant GE, regarding the deployment of the most powerful offshore wind turbine called the Haliade-X in 2021. The deployment of the 12-megawatt wind turbine is expected to put GE in the leading position in the offshore wind turbine market as the new wind […] Read more
Reliable Raw Material: strengthening the back bone of pv module! Updated On Fri, Oct 26th, 2018 by Saurenergy Identifying reliable raw material for any product is a crucial to ensure that the product lives for its lifetime. With the competitive market condition along with requirement of being cost competent selecting correct raw material to strive a perfect balance between commercial and technical terms in the product is a challenge. The scenario in case […] Read more
ScorpiusTrackers Analysis of 1 Year’s: Generation of 1.1 mwp scorpius tracker plant in karnataka Updated On Thu, Oct 25th, 2018 by Saurenergy SYNOPSIS OF PLANT 1. Canadian Solar Panels 2. ABB PV800 1MW AC Central inverter 3. BLOCK Design of 268.8 KWpx2, 282.24 KWpx2 4. Inter ROW pitch at 5.5 metres, 3.5m clear path between rows for cleaning 5. Loading of 10% on DC 6. Grid downtime of 8.8% across the year 7. PVSyst indicated a generation […] Read more
Exicom Launches Battery R&D Center, Multi-Standard Chargers for EVs Updated On Thu, Oct 25th, 2018 by Saurenergy The new R&D Centre is equipped with state-of-the-art equipment and infrastructure for comprehensive evaluation of cell quality, battery pack design, rapid prototyping and reliability/ environmental testing, the company said in a statement. Gurgaon-headquartered Exicom has launched the Battery R&D Center and Multi-Standard Chargers for Electric Vehicles (EVs) in Bangalore. The new R&D Centre is equipped […] Read more