Materials & Corrosion Engineer – TSI Updated On Mon, Jan 22nd, 2024 by Saurenergy The Materials & Corrosion Engineer is responsible for offering their expertise in corrosion and materials engineering, providing critical judgment to support the Region integrity teams in leading engineering risks and ensuring the safe, compliant, and efficient operation of the facilities. Proactively interact with other teams, sub-functions, and contractors to systematically resolve Corrosion related problems Responsibilities:- […] Read more
Project Manager – TSI Updated On Mon, Jan 22nd, 2024 by Saurenergy The Project Engineer / Project Manager – Site Projects will be responsible, as part of an integrated team, for all aspects of design, procurement, construction, and commissioning of project(s) in the range of $0.3m to $100m. These projects are delivered in a brownfield multi-project environment on Offshore or Onshore assets. The role is responsible to […] Read more
Battery Cell Costs To Touch $32-54 per kWh By 2030: RMI Report Updated On Mon, Jan 22nd, 2024 by Saurenergy A latest report from RMI claimed that the cost of battery cells is likely to fall drastically in the days to come. The report from the global energy think tank said that the cost of battery cell costs is likely to fall to USD $32-$54 per kWh. It also said that the top-tier batteries would […] Read more
Waaree Renewable Reports 158% Jump In PAT In Q3 Updated On Mon, Jan 22nd, 2024 by Saurenergy Waaree Renewable Technologies, the solar EPC subsidiary of the Waaree Group has now announced its Financial Results for Third Quarter (Q3). The consolidated financial results of the renewable firm said that its total revenue in Q3 increased by 338.78 percent on a Year-on-Year (YoY) basis. It also announced a 158.09% increase in Profit After Tax […] Read more
LONGi Makes Case For Net Zero Manufacturing At WEF Davos Updated On Mon, Jan 22nd, 2024 by Saurenergy As one of the newest recipients of the World Economic Forum (WEF) “Lighthouse Factory” recognition, Chinese solar giant LONGi made a strong case for net zero manufacturing powered by clean energy. For LONGi, which will celebrate it’s 25th year of founding in 2025, the journey to be the leading solar player has been truly impressive. […] Read more
IREDA Witnesses 67% Profit In Q3, Earnings Per Share Up by 57% Updated On Mon, Jan 22nd, 2024 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA) recently announced its audited financial results for the third quarter of the fiscal year 2023-24. The company reported a 67% increase in profit, reaching a Profit After Tax (PAT) of ₹ 335.54 crores for the quarter. This performance is attributed to the consistent growth in the loan book […] Read more
Intermediate/Senior Wind Engineer Updated On Mon, Jan 22nd, 2024 by Saurenergy RWDI are seeking a dynamic individual to join our Wind Engineering Team as an intermediate/Senior Engineer/Scientist with experience and/or understanding of wind loading of structures, long-span bridges, solar aerodynamics, and/or wind-induced microclimate effects. This role may include, depending on experience, but is not limited to:- Analysis, consulting, and oversight in the following areas: Aerodynamics and wind response of long and […] Read more
India Has Around 32 GW of RE Projects Under Bidding Stage: RK Singh Updated On Mon, Jan 22nd, 2024 by Saurenergy Union Minister of New and Renewable Energy RK Singh said in a press conference that no country could excel without sufficient power. “The power shortage in India has come down from around 4.5% in 2014 to less than 1% today,” he said. He added, “Electricity is the most important infrastructure, which is a sine qua […] Read more
NTPC Issues Tender For 1200 MW Solar Project At Khavda, Gujarat Updated On Fri, Jan 19th, 2024 by Saurenergy The National Thermal Power Corporation (NTPC) today issued a tender, seeking bids for the supply of 1200 MW of solar power for the Khadva Solar Project in Kutch in Gujarat. The tender said, “Project has the DC Capacity (MWDC) – 1515 MWp (378.75 MWp * 4 Blocks). It contains Bi-facial module with minimum Wattage of […] Read more