IREDA Witnesses 67% Profit In Q3, Earnings Per Share Up by 57% Updated On Mon, Jan 22nd, 2024 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA) recently announced its audited financial results for the third quarter of the fiscal year 2023-24. The company reported a 67% increase in profit, reaching a Profit After Tax (PAT) of ₹ 335.54 crores for the quarter. This performance is attributed to the consistent growth in the loan book […] Read more
Intermediate/Senior Wind Engineer Updated On Mon, Jan 22nd, 2024 by Saurenergy RWDI are seeking a dynamic individual to join our Wind Engineering Team as an intermediate/Senior Engineer/Scientist with experience and/or understanding of wind loading of structures, long-span bridges, solar aerodynamics, and/or wind-induced microclimate effects. This role may include, depending on experience, but is not limited to:- Analysis, consulting, and oversight in the following areas: Aerodynamics and wind response of long and […] Read more
India Has Around 32 GW of RE Projects Under Bidding Stage: RK Singh Updated On Mon, Jan 22nd, 2024 by Saurenergy Union Minister of New and Renewable Energy RK Singh said in a press conference that no country could excel without sufficient power. “The power shortage in India has come down from around 4.5% in 2014 to less than 1% today,” he said. He added, “Electricity is the most important infrastructure, which is a sine qua […] Read more
NTPC Issues Tender For 1200 MW Solar Project At Khavda, Gujarat Updated On Fri, Jan 19th, 2024 by Saurenergy The National Thermal Power Corporation (NTPC) today issued a tender, seeking bids for the supply of 1200 MW of solar power for the Khadva Solar Project in Kutch in Gujarat. The tender said, “Project has the DC Capacity (MWDC) – 1515 MWp (378.75 MWp * 4 Blocks). It contains Bi-facial module with minimum Wattage of […] Read more
SECI Invites Bids For Setting Up 1500MW ISTS Solar Power Projects Updated On Fri, Jan 19th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI), a Central government enterprise, has invited proposals for setting up Inter-State Transmission System (ISTS)-connected solar projects in India for an aggregate capacity of 1500 MW on a Build- Own-Operate (BOO) basis. Further, SECI will enter into a Power Purchase Agreement (PPA) with the successful bidders selected based on […] Read more
Lead Designer-EESS Updated On Fri, Jan 19th, 2024 by Saurenergy The primary responsibility of this position will be to provide professional front end systems support with minimal direction to prepare all necessary electrical drawings including, but not limited to, one line layout, Schematic, overall layout and connection details for complex assemblies from customer specifications and information; perform a wide variety of activities requiring the application […] Read more
Hybrid RE Power Can Cut LCOE Of Green H2 Upto $4.3/kg By 2030: Report Updated On Fri, Jan 19th, 2024 by Saurenergy A latest report from Wood Mackenzie claimed that solar-wind hybrid energy can be used to bring down the cost of production of Green Hydrogen. Wood Mackenzie is a research organization that published reports on energy and related issues. The latest report was specifically talked about the roadmap of India’s renewable sector to achieve net-zero. The Wood […] Read more
Principal Engineer Piping Updated On Fri, Jan 19th, 2024 by Saurenergy Provide the scheme to designer for the preparation of Equipment Layout and Piping layout Calculate the MTO and SOQ Piping related Spec preparation Checking of Isometrics drawings and guide the designer for the preparation of nozzle orientation Qualification And Experience:- Qualified BE / ME in Mechanical from a reputed university / institute Experience in Engineering […] Read more
MNRE Notifies Constitution Of Wind Repowering Committee Updated On Fri, Jan 19th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a notification pertaining to the constitution of a Wind Repowering Committee. The committee will be chaired by Joint Secretary (Wind), MNRE along with Director (Technical), IREDA Director (Projects), SECI as its members, the notification said. The MNRE committee on Wind Repowering will also have the […] Read more