NTPC Looks for Solar Power Developers in 1500 MW Tender Updated On Tue, Dec 26th, 2023 by Saurenergy NTPC Ltd. has issued a tender inviting online bids from eligible bidders on single stage two Envelope (that is, envelope-I: technical bid and envelope-II: financial bid) with reverse auction for the selection of solar power developers in 1500 MW tender. These ISTS connected solar power projects will be established anywhere in India. The last day […] Read more
France’s CRE PPE2 Tender Allocates 104.4 MW Solar Projects to Neoen Updated On Tue, Dec 26th, 2023 by Saurenergy Neoen, a French renewable energy producer, has initiated the construction of four solar projects totaling 104.4 MWp won in PPE2 tender. This move cements Neoen’s position among the top awardees in the recent call for tenders by the French Energy Regulation Commission (CRE), known as PPE2. Among the awarded projects, three incorporate an agrivoltaic approach, […] Read more
India Allocated Rs 5.2cr To Subsidize 11.53 lakh Electric Vehicles: Govt Updated On Tue, Dec 26th, 2023 by Saurenergy Latest data from the Ministry of Heavy Industries claimed that the Union government allocated a total of Rs 5.2 crore as subsidies to incentive 11.53 lakh electric vehicles (EVs) in the country by the end of December 1, 2023. The information was recently shared by the ministry in a media statement. The ministry said that […] Read more
NTPC REL Wins 900 MW in PFCCL 1250 MW Solar Tender Updated On Tue, Dec 26th, 2023 by Saurenergy PFCCL has announced the winners for its solar tender released a few months ago. NTPC Renewable Energy Limited has secured the bid for 900 MW capacity in the solar tender floated by PFCCL on behalf of NTPC Ltd. for the selection of 1250 MW ISTS-connected solar PV power projects in India under Flexibility Scheme. The […] Read more
Inox Wind Bags Repeat Order For 279 MW For Its 3 MW Wind Turbines Updated On Tue, Dec 26th, 2023 by Saurenergy Indian wind energy solutions company Inox Wind has bagged an order for 279 MW from a large Commercial and Industrial (C&I) player. The order is for Inox’s latest 3 MW Wind Turbine Generators (WTGs), and the scope comprises a mix of equipment supply with limited scope EPC for 180 MW and end-to-end turnkey execution for […] Read more
Adani Green Concludes PPA For Entire 8GW Manufacturing-Linked SECI Tender Updated On Mon, Dec 25th, 2023 by Saurenergy Adani Green Energy Ltd (AGEL) has announced the execution of power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) to supply 1,799 MW of solar power. With the signing of this balance PPA, AGEL has completed the power offtake tie-up for the entire 8,000 MW manufacturing-linked solar tender awarded to it by […] Read more
ETS Systems Engineer – Flow Updated On Fri, Dec 22nd, 2023 by Saurenergy Responsibilities:- Design & documentation of Flow projects Maintain the skill level of the whole engineering team. Contribute to the overall quality of the organization in the engineering space. Ensuring high performance on a variety of platforms. Creating standard protocols & documentation for repat use. Participation in Pre FAT, FAT, SAT etc Review Deliverables for Quality […] Read more
Lead DCS Engineer Updated On Fri, Dec 22nd, 2023 by Saurenergy Responsibilities:- Reviewing the Customer Project technical requirements, Specifications and Standards for DCS and C&I packages. Performing the DCS detailed engineering, design and development of Application Software, assembly and testing and commissioning of the DCS system as per the Customer requirements. Design and Implementation of controls from SAMA / Functional diagrams / Narratives / Third Party […] Read more
Parliamentary Standing Committee Recommends Incentives Under FAME Scheme Updated On Fri, Dec 22nd, 2023 by Saurenergy A standing committee report on ‘Promotion of Electric Vehicles (EV) In the Country’, mentions that, among category-wise EV, the production and sale of EV-three-wheeler vehicles is found to be highest in India. It recommends that the ministry should broaden the scope and extend FAME-II Scheme for at least three more years. This would support the […] Read more