SUBSCRIBE NEWS LETTER

us

Project Manager – TSI

The Project Engineer / Project Manager – Site Projects will be responsible, as part of an integrated team, for all aspects of design, procurement, construction, and commissioning of project(s) in the range of $0.3m to $100m. These projects are delivered in a brownfield multi-project environment on Offshore or Onshore assets. The role is responsible to […]

Read more

Battery Cell Costs To Touch $32-54 per kWh By 2030: RMI Report

A latest report from RMI claimed that the cost of battery cells is likely to fall drastically in the days to come. The report from the global energy think tank said that the cost of battery cell costs is likely to fall to USD $32-$54 per kWh. It also said that the top-tier batteries would […]

Read more

Waaree Renewable Reports 158% Jump In PAT In Q3

Waaree Renewable Technologies, the solar EPC subsidiary of the Waaree Group has now announced its Financial Results for Third Quarter (Q3). The consolidated financial results of the renewable firm said that its total revenue in Q3 increased by 338.78 percent on a Year-on-Year (YoY) basis.  It also announced a 158.09% increase in Profit After Tax […]

Read more

LONGi Makes Case For Net Zero Manufacturing At WEF Davos

As one of the newest recipients of the World Economic Forum (WEF) “Lighthouse Factory” recognition, Chinese solar giant LONGi made a strong case for net zero manufacturing powered by clean energy. For LONGi, which will celebrate it’s 25th year of founding in 2025, the journey to be the leading solar player has been truly impressive. […]

Read more

IREDA Witnesses 67% Profit In Q3, Earnings Per Share Up by 57%

Indian Renewable Energy Development Agency Ltd. (IREDA) recently announced its audited financial results for the third quarter of the fiscal year 2023-24. The company reported a 67% increase in profit, reaching a Profit After Tax (PAT) of ₹ 335.54 crores for the quarter. This performance is attributed to the consistent growth in the loan book […]

Read more

Intermediate/Senior Wind Engineer

RWDI are seeking a dynamic individual to join our Wind Engineering Team as an intermediate/Senior Engineer/Scientist with experience and/or understanding of wind loading of structures, long-span bridges, solar aerodynamics, and/or wind-induced microclimate effects. This role may include, depending on experience, but is not limited to:- Analysis, consulting, and oversight in the following areas: Aerodynamics and wind response of long and […]

Read more

India Has Around 32 GW of RE Projects Under Bidding Stage: RK Singh

Union Minister of New and Renewable Energy RK Singh said in a press conference that no country could excel without sufficient power. “The power shortage in India has come down from around 4.5% in 2014 to less than 1% today,” he said.  He added, “Electricity is the most important infrastructure, which is a sine qua […]

Read more

NTPC Issues Tender For 1200 MW Solar Project At Khavda, Gujarat

The National Thermal Power Corporation (NTPC) today issued a tender, seeking bids for the supply of 1200 MW of solar power for the Khadva Solar Project in Kutch in Gujarat.  The tender said, “Project has the DC Capacity (MWDC) – 1515 MWp (378.75 MWp * 4 Blocks). It contains Bi-facial module with minimum Wattage of […]

Read more

SECI Invites Bids For Setting Up 1500MW ISTS Solar Power Projects

The Solar Energy Corporation of India (SECI), a Central government enterprise, has invited proposals for setting up Inter-State Transmission System (ISTS)-connected solar projects in India for an aggregate capacity of 1500 MW on a Build- Own-Operate (BOO) basis. Further, SECI will enter into a Power Purchase Agreement (PPA) with the successful bidders selected based on […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll