Chief Manager – Cable Exports Updated On Mon, Jul 1st, 2024 by Saurenergy Responsible for Enquiry Generation, Offer/tender management, converting leads to achieve profitable order booking targets Position Summary:- High on customer focus , adding new accounts, customer retention Responsible for management of areas such as Sales, logistics and compliances Responsibilities:- Studying the markets in target territories Independently Responsible for Enquiry Generation, Offer/tender management, converting leads to achieve […] Read more
Electrical Engineer AC – Solar Updated On Mon, Jul 1st, 2024 by Saurenergy Project planning and Execution Site coordination and management Resource management Erection and Installation Quality and Safety at site Procurement and Material Management Contractor Management Stakeholder Management Monitoring and controlling Logistic management and operation Material Management Responsibilities:- Responsible of Project construction to Achieve contractual schedule Good hands-on experience of Pooling substation, GSS, SCADA, ICR electrical, AC […] Read more
PEM Civil PV Solar Updated On Mon, Jul 1st, 2024 by Saurenergy The person shall be responsible for the complete design and detailed engineering for Solar Power plants in Gigawatt scale. The PEM shall manage the entire design for a project or a set of projects as assigned including co-ordination with other disciplines viz., Electrical, instrumentation and Mechanical PEM shall lead a team of Lead Engineers, Design […] Read more
Assistant Manager Channel Sales Updated On Mon, Jul 1st, 2024 by Saurenergy The position is responsible for efficiently and effectively managing partners and ensuring increase in the walk-ins numbers, order booking and increase in sales revenue targets, unit sales and collections (within given budget and timelines) for the assigned project/s. Key Accountabilities:- Sales Value (Rs. Cr) and Volume achievement (Units) as per target. (Sales = Net Order Book) […] Read more
Green Stocks July 1: Waaree, Shakti Pumps Stock Prices Up Updated On Mon, Jul 1st, 2024 by Saurenergy The stock prices of Waaree Renewable and Shakti Pumps today witnessed the highest surge of 5 percent. Other green energy stocks of companies like Inox Wind Energy, Gensol Engineering also witnessed a surge in their overall stock prices. The only companies which reported a decline in their stock prices included KPI Green Energy, Tata Power […] Read more
Avaada Energy Secures 820 MWp-Hybrid Project From SJVN Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Avaada Energy, a subsidiary of Avaada Group secured an 820 MWp Hybrid-Inter-State Transmission System (ISTS) capacity in the recent e-Reverse Auction (e-RA) held in June 2024. This project was awarded by SJVN Limited, as confirmed in the Letter of Award (LoA). Vineet Mittal, Chairman of Avaada Group, stated, “Securing 820 MWp-hybrid-ISTS capacity is a […] Read more
Waaree Receives 900 MW Order From Serentica For Project In Rajasthan Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Waaree Energies Ltd., India’s largest solar PV modules manufacturer with an aggregate installed capacity of 12 GW as of June 30, 2023 has received a 900 MW module supply deal from Serentica Renewables India Private Limited. Waaree Energies received this contract for a project located in Fatehgarh, Jaisalmer, Rajasthan, India. This project is expected […] Read more
Lead Designer-Panel and Switchboard Updated On Mon, Jul 1st, 2024 by Saurenergy Lead Designer will be responsible for interpreting detailed non-standard switchboard product customer requirements and translating them into the final design package for the shop floor for smoother manufacturing of customized switchboard as a product. Contact field sales and/or the end customer or Consulting Engineer as required to ensure accurate interpretation of the intent of the […] Read more
NTPC-REL Launches Tender For 1200 MW Hybrid Project Across India Updated On Mon, Jul 1st, 2024 by Saurenergy National Thermal Power Corporation Renewable Energy (NTPC-REL), has released a tender, inviting bids for the selection of hybrid power generators on Build Own Operate basis. This project is undertaken to supply 1200 MW of power from ISTS-Connected wind-solar hybrid power projects anywhere in India. the last date for submitting bids is August 7, 2024. The […] Read more