Manager-Engineering & Commissioning Renewable Projects Updated On Mon, Aug 5th, 2024 by Saurenergy Responsibilities:- Having Knowledge of PLC, SCADA Automation work, HMI Design, Factory Acceptance Test, etc. Knowledge of Design Engineering documents like RFQ, GAD, FDS, FAT, SAT, Signal List etc. as per project requirement. Have experience of managing the team. Responsible for the development & deployment of Solar Scada systems and the programming of PLC’s. Knowledge of […] Read more
SHE Electrical Engineer Updated On Mon, Aug 5th, 2024 by Saurenergy Monthly Inspection of electrical hand tools Quarterly Inspection of temporary electrical systems All the Electrical equipment will be checked on regular basis “Green Card” system will be followed for all electrically operated equipment’s / hand tools Prepare electrical single line diagram, schematic diagram and the details of the equipment for all temporary electrical installation and […] Read more
BluPine Energy On Track To Achieve Its RE Targets: Rahul Mishra Updated On Mon, Aug 5th, 2024 by Saurenergy BluPine Energy started operations in India in 2021. Since then what were the major milestones for the firm? BluPine started its Commercial and Industrial (C&I) segment in 2022. Since then, we have secured around 400 MW of C&I projects in states like Karnataka, Maharashtra, and Chattisgarh. The company has planned to add a cumulative renewable […] Read more
IEX Energy Exchange July Update- Traded Volumes Up 56% YoY Updated On Mon, Aug 5th, 2024 by Saurenergy Indian Energy Exchange (IEX) achieved the highest ever total volume (including certificates) of 13,250 MU in July 2024, marking a ~56% year-over-year increase. The electricity volume at 10,093 MU, increased 29% YoY for IEX in July. Green electricity volume during the month at 1 BU, grew 259% YoY. The renewable energy certificates (REC) at 3,150 […] Read more
Amara Raja Reports Solid Q1 Results, Commissions 90 MW Solar For NTPC Updated On Mon, Aug 5th, 2024 by Saurenergy Hyderabad based Amara Raja Energy & Mobility Limited (ARE&M), (formerly known as Amara Raja Batteries Limited), has reported profit before tax of ₹ 328.66 Cr for Q1 of FY25 registering a growth rate of 23% over Q1 of FY24. Standalone financial performance highlights: (₹ in crores) Particulars Quarter Ended Jun 30, 2024 Jun 30, 2023 Revenue […] Read more
Robot Programmer /Control Engineer Updated On Fri, Aug 2nd, 2024 by Saurenergy Responsibilities:- Develop, test, and implement ABB robotic programs for palletiser applications. Collaborate with the engineering team to design and optimize robotic work cells. Troubleshoot and resolve issues related to robotic systems, including software, hardware, and integration problems. Conduct regular maintenance and updates to ensure optimal performance of robotic systems. Provide technical support and training to […] Read more
FAME-II Aided Deployment Of 16.7L EVs In India: Govt Updated On Fri, Aug 2nd, 2024 by Saurenergy The Minister of State for Heavy Industries and Steel Bhupathi Raju Srinivasa Varma in a written reply before the Rajya Sabha today said that the FAME-II scheme aided in the deployment of 16 lakh Electric Vehicle (EVs) in India. The scheme earlier had helped the EV sector to expand with a hand-holding support to the […] Read more
PM Surya Ghar: UPNEDA Earmarks Rs 2cr On Awareness Updated On Fri, Aug 2nd, 2024 by Saurenergy In a bid to create awareness on rooftop solar through PM Surya Ghar scheme, the Uttar Pradesh New and Renewable Energy Developemnt Agency (UPNEDA) has earmarked Rs 2 crore. This budget is set to be used for planning, strategy and implementation of IEC ((Information, Education and Communication) activities in cities like Ayodhya, Gorakhpur and Varanasi. […] Read more
Shakti Pumps Secures Order To Supply 12,537 Solar Pumps To UP Updated On Fri, Aug 2nd, 2024 by Saurenergy To boost the availability of solar water pumps throughout Uttar Pradesh (UP), the State Department of Agriculture has awarded a Letter of Intent (LoI) to Shakti Pumps. The Madhya Pradesh-based solar pump company received an order for 12,537 pumps to be supplied across the state under the Component B of the PM-KUSUM scheme (Phase-III). The […] Read more