Delhi’s Motor Vehicles Emit More In Real Operations: Report Updated On Fri, Aug 23rd, 2024 by Saurenergy Delhi and nearby Gurugram have suffered the debilitating impacts of poor air quality for decades. The transport sector has been a major contributor to this form of air pollution, a study by Real Urban Emissions (TRUE) Initiative revealed. The study was conducted in collaboration with authorities in Delhi and Gurugram, utilizing non-intrusive remote sensing technology […] Read more
SUN Mobility, Tata Motors Tieup To Boost EV Expansion Updated On Fri, Aug 23rd, 2024 by Saurenergy SUN Mobility, a sustainable energy solutions company announced the launch of retrofit kits for Tata ACE vehicles, in collaboration with Bluwheelz. This initiative aims to revolutionize the logistics sector by enabling fleet operators to convert their existing Tata ACE internal combustion engines (ICE) or fixed battery vehicles to swappable electric vehicles (EVs) equipped with SUN […] Read more
SECI Seeks 800 Acres Of Land For 200 MW Solar Project In MP Updated On Fri, Aug 23rd, 2024 by Saurenergy Solar Energy Corporation of India (SECI) recently released a tender for the selection of an agency for the outright purchase or lease of 800 acres of land for the development of a 200 MW solar project in Madhya Pradesh with September 23 as the last date for bids submission. The SECI tender states that for […] Read more
Pipe Stress Analysis Engineer Updated On Fri, Aug 23rd, 2024 by Saurenergy This role plays a vital part in Arcadis’s Global Excellence Centre (GEC), which serves as the centralized and fully integrated project delivery group. With over 3,000 skilled professionals stationed across offices in India, Romania, and the Philippines, our GEC offers Capability, Capacity, and a Competitive Advantage across diverse projects and services, collaborating closely with our […] Read more
NTPC Awards JSW Neo 300 MW Of Hybrid Power Projects Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), a subsidiary of JSW Energy Limited, received a Letter of Award (LoA) for a 300 MW ISTS-connected Wind-Solar Hybrid Power Project from NTPC Limited. JSW Neo Energy got this project against a tariff-based competitive bid and was invited to set up 1,000 MW ISTS-connected Wind-Solar Hybrid Power Projects (NTPC-Tranche-VI). […] Read more
O&M Manager (Solar and Wind Turbine) Updated On Fri, Aug 23rd, 2024 by Saurenergy We are seeking an experienced Operations and Maintenance (O&M) Manager who will be responsible for overseeing the efficient operation and maintenance of solar, wind turbine and BESS installations across multiple locations. The ideal candidate will have extensive experience in managing outsourced renewable energy O&M jobs, particularly in managing both solar and wind assets. This role […] Read more
Draft Norms: MoP Proposes Timeline Of 66 Months For PSPs Updated On Fri, Aug 23rd, 2024 by Saurenergy The Ministry of Power (MoP) has now issued draft guidelines for the issuance of tenders related to Pumped Storage Projects (PSPs). The new proposed norms mandate that the on-river PSPs need to commence its operations after 66 months after the signing of the Power Purchase Agreement (PPA). For the off-river projects, the developers need to […] Read more
Bangalore Discom To Get Solar Power From Pavagada At Rs 2.89/unit Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Renew Energy Twenty Limited, a subsidiary of JSW Energy Limited, has signed a Power Purchase Agreement (PPA) with Bangalore Electricity Supply Company Limited (BESCOM) for a solar capacity of 300 MW. The project was awarded by the Karnataka Renewable Energy Development Limited (KREDL), the state nodal agency for renewable energy in Karnataka. The power […] Read more
Winding Up: Global Offshore Wind Installations To Surpass 520 GW by 2040 Updated On Fri, Aug 23rd, 2024 by Saurenergy Global offshore wind projects are set to defy all predictions of doom and gloom, based on energy research firm Rystad’s Predictions. Offshore wind energy, which has been in the news in recent months for all the wrong reasons, be it inflationary pressures, supply chain disruptions, exemplified by postponed permitting processes, delayed auctions and slow supply […] Read more