Green Stocks Feb 19: Stocks Claw Back Losses Updated On Wed, Feb 19th, 2025 by Saurenergy On an ordinary day with no decisive move for the Nifty, our green pack certainly found the energy to make a move to recover some of the lost ground in recent weeks. That meant stocks like Shakti Pumps, KPI Green, and even SWREL made strong gains. Wind energy stocks Inox Wind and Suzlon gained as […] Read more
Assistant Manager- ELV Design Updated On Wed, Feb 19th, 2025 by Saurenergy Responsibilities:- Familiar with MEP Design, capable of handling the in-house design deliverables for various Residential, Commercial, Mall, Hotel, Data Centre developments etc. Front End Engineering Design (FEED) Project Engineering Development Product Engineering Evaluation Value Engineering Market Rate Assessment Innovative Technological Study Appointment of Consultants Consultancy Payment Certification Consultants’ Additional Fee Claims & Validation Tender Documentation […] Read more
System Design and Study Engineer Updated On Wed, Feb 19th, 2025 by Saurenergy Engineering authority in design studies and performance evaluation studies for projects/tenders for Flexible A.C. Transmission Systems (FACTS) technology aligned with Power Quality Solutions (PQS) Business. Roles and responsibilities: Define topology and single line diagram for FACTS solution based on customer requirement. Specify main circuit components such as Power Transformer, Power Electronics Valves, Reactors, Capacitors, CT, VT, Breaker etc. based […] Read more
Madhya Pradesh Allocates Rs. 2 Crore For EV R&D Promotion Updated On Wed, Feb 19th, 2025 by Saurenergy Soon after releasing its draft electric vehicle (EV) policy, the Madhya Pradesh (MP) cabinet has now approved the “Electric Vehicle Policy-2025.” This cabinet approved this policy under the chairmanship of Chief Minister (CM) Yadav. The Cabinet approved the policy to make electric vehicles the primary mode of transportation for the general public in the future. […] Read more
Trina Tracker Opens 3 GW Solar Manufacturing Factory In Saudi Arabia Updated On Wed, Feb 19th, 2025 by Saurenergy TrinaTracker, a smart solar tracking solutions provider and a Trinasolar subsidiary has established a new manufacturing facility in Saudi Arabia. The facility is set to begin operations in Q1 2025. Trina Tracker for Renewable Energy, helps the company enhance its localization and its distribution and service capabilities in the MEA region. The factory is part […] Read more
SaurEnergy Explains: Balcony Solar – A Game Changer for Apartment Dwellers? Updated On Wed, Feb 19th, 2025 by Saurenergy Solar power has taken over the world’s new power projects, becoming the harbinger of the renewable energy age that everyone awaited for so long. Indeed, the utility scale mega solar projects and rooftop solar have been the mainstream type of solar installations. However, other solar power systems, like the balcony solar systems, are quietly gaining […] Read more
Matel, Honda Power Pack Partner To Bring Swappable EV Batteries Updated On Wed, Feb 19th, 2025 by Saurenergy Matel Motion & Energy Solutions Pvt. Ltd. (Matel) has entered into a strategic partnership with Honda Power Pack Energy India Pvt. Ltd. (HEID) to integrate its ePowertrain with HEID’s swappable battery solution. This collaboration aims to provide electric vehicle (EV) manufacturers with swappable battery solutions. Range limitations and lengthy charging time remain key challenges for […] Read more
Engineering manager – Solar & Substation Updated On Wed, Feb 19th, 2025 by Saurenergy Responsibilities:- Evaluates, selects and applies standard techniques and procedures to perform engineering assignments. Provides technical support for testing, installation and commissioning activities. Prepares projects documentation within one’s scope of deliverables. Assists in preparing proposal/presentation of engineering projects/programs (provision of bills of materials, estimated engineering hours, etc.). Supports Contract Managers in issuing claims (new/change in scope […] Read more
MoP Advises REIAs To Co-Locate ESS With Solar Plants In Upcoming Tenders Updated On Wed, Feb 19th, 2025 by Saurenergy The Ministry of Power (MoP) has released an advisory on the co-location of energy storage systems (ESS) with solar plants. Its latest advisory aims to incorporate a minimum of a 2-hour co-located Energy Storage System (ESS) equivalent to 10% of installed solar capacity in future tenders. The notification stated, “This requirement will help mitigate intermittency […] Read more