Project Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Responsible for operational level understanding of the requirement of the client/customer, Site Visits, Site feasibility & Solar Systems Design and complete execution. Able to check site […] Read more
Design Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Create plans for solar energy system development, monitoring, and evaluation activities. Prepare detailed work plans. Conduct engineering site audits to collect structural, electrical, and related site […] Read more
O&M Engineer-Solar PV Plant Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 3 years of experience, preferably in the area of Solar PV Power plants and projects. Qualification: BE/ Diploma – Electrical, Electrical preferable Location: Pune Key Responsibilities / Accountabilities: Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as […] Read more
Enel’s First Large-Scale Wind + Storage Hybrid Project Will Support Kellogg Company With Renewable Energy Updated On Sat, Mar 6th, 2021 by Saurenergy Enel, through its US renewable subsidiary Enel Green Power North America, has started construction of Azure Sky wind + storage, its first large-scale hybrid project globally to integrate wind and battery storage at one site. Through a 100 MW virtual power purchase agreement (VPPA), Enel will sell to Kellogg Company a 360 GWh portion of the electricity […] Read more
WeeyLock- Solar-Powered Smart Bike Lock Updated On Sat, Mar 6th, 2021 by Saurenergy PRODUCT BRIEF: WeeyLock is the smartest solar powered bike lock ever made. PRODUCT FEATURES: WeeyLock comes with a Smartphone unlock and Key fob unlock. It has a theft alert alarm. Being solar powered, it performs self-charging, and it also has GPS tracking system and records the cycling data as well. WeeyLock is waterproof. Weeylock supports […] Read more
Solar Charger – The Bracelet Updated On Sat, Mar 6th, 2021 by Saurenergy PRODUCT BRIEF: A solar charge in form a 3600 flexible solar cell – bracelet PRODUCT FEATURES: It is Very light and strong with a Rechargeable Battery 3000mAh. Comes with a Mini two-color LED. Have 8GB storage for your data and comes in Different color versions. PRODUCT APPLICATION: Expose your bracelet on any light source and you’ll […] Read more
Renewable Energy Integration is India’s Next Big Challenge: IEEFA Updated On Fri, Mar 5th, 2021 by Saurenergy According to a report from Institute for Energy Economics and Financial Analysis (IEEFA), India already has 93 GW of on-grid variable renewable energy (VRE) capacity as of January 2021. Now, one of the next big challenges for India’s electricity sector is battery storage, green hydrogen, and flexible coal-fired power generation into the electricity grid i.e. […] Read more
Sr. Marketing Engineer (Electronics) Updated On Fri, Mar 5th, 2021 by Saurenergy Experience Graduate engineer with 5 to 6 years experience in marketing of industrial & automotive electronics products is required. Read more
Average Rural Power Supply Duration has Increased to 18.5 Hours Updated On Fri, Mar 5th, 2021 by Saurenergy RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in 2019-20. Addressing the Power Ministry Parliamentary Consultative Committee in a meeting, Power Minister RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in […] Read more