CAD Engineer Updated On Wed, Aug 18th, 2021 by Saurenergy Prepares detailed isometrics, layouts, general arrangements, P&ID and related CAD data for assignments related to oil and gas plants as part of integrity engineering under little supervision. Duties & Responsibilities:- Functions:- Essential:- Prepare Process Flow Diagrams and P&IDs. Create as-built and isometric drawings for piping and structural components. Proficient in drafting symbols used in PFDs, […] Read more
4 Days to Aug 22 Deadline for Feedback on Rooftop Solar Guidelines Updated On Wed, Aug 18th, 2021 by Saurenergy The revised deadline for feedback on rooftop solar systems is August 22. The MNRE has shared a detailed feedback document for stakeholders to share their feedback. As readers are aware, India has performed quite poorly on its rooftop solar segment. From a target of 40 GW out of the 100 GW of solar capacity that […] Read more
MNRE Releases Updated ALMM List With 3 New Additions Updated On Wed, Aug 18th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued an updated list of approved manufacturers in its ALMM (Approved list of module manufacturers) list. The List is effective August 17, 2021, with the certifications valid to August 16, 2023, or two years. While broadly in line with the previous list, the fresh list has […] Read more
Senior Technician / Engineer -Mechanical Updated On Tue, Aug 17th, 2021 by Saurenergy The selected candidate will be responsible for :- Model building and drawings of building services elements. Basic design calculations. Quantities take off based design drawings. Carrying out checking of drawings. Coordination between other MEP disciplines, such as Electrical, Plumbing services. Work within time limits to complete deliverables on time. Candidate Specification:- Be a Diploma /graduation […] Read more
Engineer/Modeller-Highways Updated On Tue, Aug 17th, 2021 by Saurenergy 3D modelling with an opportunity to do detail design of Highways and transport alignments, Junction design (at grade or grade separated), prepare reports, specifications and other deliverables for highways schemes. To ensure designs are appropriate and meet the expected levels of technical excellence. Assisting with feasibility, preliminary and detailed design work relating to highways engineering […] Read more
APTEL Sets Aside KERC Order, Restores Benefit To Solar Developer Updated On Tue, Aug 17th, 2021 by Saurenergy The Appellate Tribunal for Electricity (APTEL) has ruled in favour of a small solar power developer, Hunsankodilli Solar Power Project LL.P (developer) that has set up a 3 MW solar plant in Karnataka. The ruling follows a similar one declared early in August where the apex authority had taken a similar view. The developer had […] Read more
California Goes With Rule for Solar and Battery Storage on New Buildings Updated On Tue, Aug 17th, 2021 by Saurenergy The California Energy Commission (CEC) has adopted the 2022 Building Energy Efficiency Standards (Energy Code) for newly constructed and renovated buildings that say the new buildings need to be equipped with solar and battery storage for clean energy goals. As the state’s primary energy policy and planning agency, the CEC adopts standards every three years […] Read more
Energy Engineer Updated On Tue, Aug 17th, 2021 by Saurenergy Redaptive is looking for a self-motivated, passionate, and collaborative Energy Engineer/Engineering Application Specialist to work closely with our growing International Electron team based in the US & India. The Energy Engineer/Application Specialist will collaborate with the Engineering Solutions, Data Analytics, and Business Development team. Redaptive is an energy management and technology company introducing the concept […] Read more
Canadian Solar Reports $1.43 Billion Revenues in Q2 FY21, a 105% YoY Increase Updated On Tue, Aug 17th, 2021 by Saurenergy Canadian Solar Inc. has announced its financial results for Q2 FY21 with strong revenues of $1.43 billion. The firm reports that net revenue in the Q2 FY21 grew by 105% YoY and 31% QoQ to $1.43 billion. The sequential improvement was driven by an increase in module shipments and average selling price (ASP), growth in […] Read more