Modeler/Engineer – Lighting/Electrical Updated On Tue, Jun 8th, 2021 by Saurenergy Set up infrastructure projects and associated x-refs on ProjectWise and set up the required elements for electrical and lighting power using AutoCAD, Civil 3D and Revit. Prepare electrical circuit schedules (or equivalent) from the drawings or models. Comply with best in class QA/QC procedures for all project deliverables. Pay close attention to quality and technical […] Read more
Renewables Produce Record 50.7% of Energy in May in Spain Updated On Tue, Jun 8th, 2021 by Saurenergy The Red Eléctrica de España (REE), a partly state-owned and public limited corporation which operates the national electricity grid in Spain, recently reported that renewable energy reached an important milestone last month when, for the first time, more than half of the energy produced in the country was of renewable origin. The data supplied by […] Read more
JinkoSolar Showcases High Tech Panel Offerings At SNEC 2021 Updated On Tue, Jun 8th, 2021 by Saurenergy The 15th SNEC International Photovoltaic Power Generation and Smart Energy Conference & Exhibition was held in Shanghai, China, on June 3-5, 2021. At the exhibition, several solar firms launched their new products, which predominantly reflect trends and developments across multiple markets. One of the largest solar panel manufacturers worldwide, JinkoSolar Holding Co., Ltd. unveiled some […] Read more
HVAC Engineer Updated On Tue, Jun 8th, 2021 by Saurenergy Preparation of Specification. Preparation of HVAC Requisition (MR / PR, Bill of quantity, Scope table). Vendor Offer Evaluation. Preparation of Technical Bid comparison. Review of Vendor document based on specification. Coordination with interface for Internal Deliverable (Electrical Load, Civil work volume, Utility requirements). Coordination with Client, Vendors, Internal Disciplines, Procurement, Project Management Team. Participation in […] Read more
Building Coordinator Updated On Tue, Jun 8th, 2021 by Saurenergy Detail knowledge of Installation & Complete understanding of various services in the Building like; HVAC (ducting, diffuser, etc), Lighting, Fire alarm, Earthing & Lightning protection, Cable Tray and conduit routing, Telephone, CCTV, LAN,IT requirements, Public address system, Fire protection system, Plumbing, Rainwater down comer & All RCC elements. Able to work on REVIT 3D model […] Read more
Charles River & Duke Energy sign VPPA for 250 MW Solar project in Texas Updated On Tue, Jun 8th, 2021 by Saurenergy Charles River Laboratories International, Inc. yesterday announced a long-term solar energy contract to address the entirety of the company’s North American electric power requirements with clean, renewable energy by 2023. Charles River and Duke Energy Sustainable Solutions have entered into a 15-year, 102 megawatt (MW) virtual power purchase agreement (VPPA). Charles River’s portion of the […] Read more
SECI Posts Another Bid Deadline Extension for Solar Tender in Tamil Nadu Updated On Tue, Jun 8th, 2021 by Saurenergy New Delhi-headquartered Solar Energy Corporation of India Limited (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW (AC) solar PV project with land having 10 years plant O&M at Tamil Nadu. The last date for bid submission has been extended from June […] Read more
IREDA Extends Bid Date For 12 GW CPSU Solar Scheme Updated On Tue, Jun 8th, 2021 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA), the implementing agency appointed by Ministry of New & Renewable Energy (MNRE) for the CPSU Scheme Phase II has extended the bid submission date to 15th June. The Central Public Sector Undertaking (CPSU) scheme phase-II envisages setting up 12,000 MW grid-connected solar projects with viability gap funding (VGF). […] Read more
Cell Shortage Forces Timeline Extension by MNRE For CPSU Phase II Solar Updated On Tue, Jun 8th, 2021 by Saurenergy As predicted by many Industry experts, domestic cell production has failed to keep up with demand for various central schemes that mandate local sourcing. Now the Ministry of New And Renewable Energy (MNRE) has stepped in to provide and extension to projects under tranche I and II of the CPSU Phase II scheme. The MNRE […] Read more