SUBSCRIBE NEWS LETTER

us

Is It Possible To Build Smaller Yet Long-Lasting Lithium Batteries? 

Lithium-ion batteries have now become indispensable to households across the world. With their excellent energy storage, lightweight, and recharging potential, these batteries are now finding their rampant usage in Electric Vehicles (EVs) and other household energy storage devices. But is it possible to build more long-lasting and smaller Lithium-ion batteries of equal or more capacity? […]

Read more

National Hydroelectric Power Corporation Limited

EPC contract for development of 50 MW Floating Solar Power Project and associated transmission system for Grid Connectivity along with Comprehensive O and M for 05 (Five) years at West Kallada District-Kollam, in the state of Kerala

Read more

National Hydroelectric Power Corporation Limited

EPC Contract for development of 300 MW Capacity Floating Solar Power Project and associated 220 KV transmission line for connectivity at 400 KV Grid substation along with Comprehensive O and M for 05 years at Rengali Reservoir Angul, Odisha

Read more

Highest Cost of Financing for RE in Mexico, Egypt & Tunisia, Lowest in Germany: IRENA

IRENA (International Renewable Energy Agency) has released a report entitled ‘The Cost of Financing for Renewable Power’.  The Cost of Capital (CoC) is a major determinant of the total price to purchasers of electricity from renewable power generation technologies. As per the report, incorrect assumptions for CoC are not accurate, the cost of electricity might […]

Read more

Engineer or Senior Electrical Engineer (HV)

Key responsibilities:- To add one engineer / senior engineer to support High voltage design and detailed engineering of transmission, distribution and offshore / onshore substation engineering activities for Energy Systems group of Ramboll Energy division, Chennai Design / review and detailed engineering for HV power lines, HV cables, transmission, distribution substations Calculation of induced voltages […]

Read more

Govt To Disburse Subsidy Dues To Ola, Ather, Hero & TVS Under FAME-II

The Ministry of Heavy Industries, the nodal government agency handling the Faster Adoption of Manufacturing of Electric Vehicle (FAME)-II scheme, has been mulling returning the due subsidies of four major electric two-wheeler companies, reports claimed.  The move comes days after these EV players announced reimbursing the EV customers to whom these companies sold EV chargers […]

Read more

EMIR Design Methodology Engineer

Roles and Responsibilities:- Perform power integrity analysis (IR), and Electro-migration (EM) using Redhawk SeaScape and/ or Cadence Voltus, provide feedback, and recommend EMIR mitigation strategies Develop procedures, analysis, and design automation methodologies for power integrity challenges Generate needed views and input data for Power Integrity Analysis Help improve the design flow and methodology Supporting Chip […]

Read more

JAKEDA Issues EoI for EPC, O&M of Rooftop Project of 200 MW Under Jammu Solar City Mission

Jammu and Kashmir Energy Development Agency (JAKEDA), has invited sealed EoI from eligible firms/vendors for solar photovoltaics as per MNRE, GoI, policy and guidelines for phase-II of grid connected rooftop solar PV power plants scheme for site survey, design, supply, erecting, testing and commissioning including warranty, comprehensive maintenance contract (CMC) for five (05) years of […]

Read more

Assistant Lead Engineer- P LM & MDM

Responsibilities Receive and analyze requests to update task lists (work types) based on Various stake holders (agent’s input), and technical supports For any given input data for task list should able to analyse the Input data accordingly need to evaluate,interpret and create & update task list Create and update guidelines to facilitate agents & relevant […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll