JA Solar Supplies Bifacial Modules for Solar Project in Malaysia Updated On Wed, Aug 5th, 2020 by Saurenergy JA Solar has supplied 43.8 MW bifacial double-glass modules for the 1st solar project that combines bifacial double-glass modules with trackers in Malaysia. JA Solar has announced that it has supplied 43.8 MW bifacial double-glass modules for the first solar project that combines bifacial double-glass modules with trackers in Malaysia. The project is expected to […] Read more
Banpu to Acquire 37.6 MW El Wind Mui Dinh Wind Farm Updated On Wed, Aug 5th, 2020 by Saurenergy Acquisition is Valued at $66 million Banpu Public Company Limited, a leading integrated energy solutions company in Asia-Pacific, is acquiring the 37.6 MW El Wind Mui Dinh Wind Farm. The acquisition is valued at $66 million. The El Wind Mui Dinh Wind Farm has been operational since April 23, 2019. According to a company release, […] Read more
GE to Supply 209 MW of Wind Turbines Updated On Wed, Aug 5th, 2020 by Saurenergy GE Renewable Energy has won contracts for the construction and long-term operation of the 209 MW Murra Warra II wind farm in Victoria, Australia GE Renewable Energy selected to supply Cypress wind turbines totaling 209 MW for Murra Warra II wind farm in Victoria, Australia. Construction of the project will commence later this year and […] Read more
5 Reasons Why Rooftop Solar Needs to Make The Technology Jump Updated On Tue, Aug 4th, 2020 by Saurenergy Pick Smart India’s ambitious solar targets of 100 GW by 2022, and 450 GW by 2030, are largely built around massive ramp ups in large scale deployments, or ‘utility scale’ solar. These comprise designated solar parks, even ultra large parks, and other hundred MW plus installations that will feed into the grid directly. But the […] Read more
Siemens Gamesa Impacted by COVID, Reports Net Loss of €466 mn in Q3 Updated On Tue, Aug 4th, 2020 by Saurenergy Siemens Gamesa performance in Q3 of FY 2020 reflected the impact of COVID-19 on its operations as well as challenges in the Onshore business Siemens Gamesa performance in the third quarter (Q3) of FY 2020 (April-June) reflected the impact of COVID-19 on its operations as well as challenges in the Onshore business, due to the slowdown […] Read more
India’s Top 5 Power Producers And their Renewable Energy Plans Updated On Tue, Aug 4th, 2020 by Saurenergy In the broader developed economies, the push for renewable energy has already gone well past the stage for policy pushes, with many firms and power producers making decisive, long term shifts even as pressure, both public and from the government, still builds up. That is one reason why coal fired plants are shutting down faster […] Read more
The same duties on imports of cells & modules are not going to serve the purpose: Prasoon Chaudhary Updated On Mon, Aug 3rd, 2020 by Saurenergy In a chat with Prasoon Chaudhary, Business Unit Head, Photovoltaic Solar Manufacturing at Pennar Industries Limited, we got his perspective on the many challenges the module side of the business faces today. After their success in the mounting structures business, the engineering goods firm is looking ahead to replicating the same level of success in […] Read more
China to add 251 GW of new wind capacity by 2029 Updated On Mon, Aug 3rd, 2020 by Saurenergy Subsidy phase-out to impact 16% of onshore wind capacity additions China is expected to add 251 GW of new wind power projects to its grid by 2029. According to a Wood Mackenzie report, the country’s wind power market could reach a cumulative grid connected capacity of 461 GW by the end of the decade. More […] Read more
Energy & Meteo Systems: RE Forecasters To The World Updated On Sat, Aug 1st, 2020 by Saurenergy Germany-based Energy & Meteo systems is one of the little known names, that packs quite a punch when you take a hard look at their work. The firm, which recently announced their formal entry to India with their energy forecasting solutions, has already pocketed the forecasting for Pavagada solar park, one of the biggest in […] Read more