Govt. has formulated Wind Solar Hybrid Policy to Strengthen Energy Security of India: Piyush Goyal Updated On Tue, Aug 2nd, 2016 by Saurenergy Power, Coal, New & Renewable Energy and Mines Minister- Piyush Goyal in a written reply to a question in the Rajya Sabha said that the Government has formulated draft National Wind-Solar Hybrid Policy to Strengthen Energy Security of India. The objective of the policy is to provide a framework for promotion of large grid connected […] Read more
RPO enforcement and REC markets need to be revived and net metering needs to be simplified: Kunal Chandra, head of PROINSO India Updated On Tue, Aug 2nd, 2016 by Saurenergy PROINSO has two divisions; Distribution & Integration and EPM (Engineering, Procurement and Management) for projects. The company offer supply and services to installers, construction companies and clients for utility, commercial and residential projects worldwide. With decade of solar experience, Proinso has 27 offices across 6 continents. Kunal Chandra, head of PROINSO India shares with us […] Read more
Industrial and Commercial roof top programs are very encouraging: Krishnan Rajagopalan Head Solar Business, Anchor by Panasonic Updated On Tue, Aug 2nd, 2016 by Saurenergy Government’s two most ambitious program are 60 GW Grid Connected Solar Power generation and 24 x7 power access to users. With the current state of Transmission and distribution (T&D)system (where state level balancing of power in Grid is a severe issue), are they complimenting each other or do you see an urgent need for a […] Read more
Koyna’s Dam to get floating solar panels to generate 600MW power Updated On Thu, Jul 28th, 2016 by Saurenergy A proposal to set up floating solar panels on a surface area of 891 square kilometres on Koyna dam has been cleared. It will be used for solar power generation. The primary survey for the dam has been completed and the next stage of planning is currently underway. Departments like water resources, transmission, and renewable […] Read more
Solar Power Tariffs expected to drop to as low as INR 3.50 a unit in 3 years Updated On Tue, Jul 26th, 2016 by Saurenergy Solar power tariffs in India, which fell below Rs. 5 per unit since last November, are once again expected to sink further as the industry doubles volumes every year and the cost of producing power continues to drop. A report published in the Mint mentions that that tariffs will fall to as low as 3.5 […] Read more
NALCO Inviting Bids For 20MW Solar PV Project in Madhya Pradesh Updated On Fri, Jul 22nd, 2016 by Saurenergy National Aluminium Company Limited (NALCO), a Navratna CPSE under Ministry of Mines, Govt. of India inviting bid for setting up a 20MW solar PV project in Madhya Pradesh. The identified Govt. revenue land of approximately 55.62 hectare bearing Khasra Number 892,860,909,914,908,917,921,919,974,975,976 at Palra village, Susner Tehsil, Agar Malwa Dist of M.P, as per the requirement […] Read more
India sanctions scheme to develop 10 Solar Zones having at least 10000 hectares of land Updated On Thu, Jul 21st, 2016 by Saurenergy The Government o India has directed authorization to implement the scheme for setting up of 10 ‘Solar Zones’ each having at least 10000 hectares of govt. or privately owned uncultivable and fallow land in one or more than one patches to encourage solar PV project developers, investors and manufacturers to help achieve the nation’s massive […] Read more
Indian Government doubles down on Solar Parks after SunEdison Setback Updated On Wed, Jul 20th, 2016 by Saurenergy According to the reports from a top government official, India is expected to double the target for energy to be generated from solar parks by 2020, as roof-top installations progress has turned out to be slower than anticipated and U.S. company SunEdison’s projects are threatened by its bankruptcy. The Indian Government acquired lands are most […] Read more
Government doubles power generation target from solar energy parks Updated On Tue, Jul 19th, 2016 by Saurenergy Centre is gearing up to double the clean energy generation from solar parks to 40,000 MW in the backdrop of slow offtake of rooftop solar and problems being faced by some project developers. PTI citing a senior government official reports that the Ministry of New & Renewable Energy is eager to set up solar park […] Read more