Neoen Secures 352 MWp Landmark PPA With CleanCo Updated On Thu, May 7th, 2020 by Saurenergy Neoen has signed a 352 MWp PPA with CleanCo Queensland in one of Australia’s most substantial renewable energy agreements to date. Neoen, one of the world’s leading and fastest-growing producers of exclusively renewable energy, has signed a 352 MWp power purchase agreement (PPA) with CleanCo Queensland in one of Australia’s most substantial renewable energy agreements […] Read more
PV Is Entering The AI Era- Huawei Leaders Updated On Wed, May 6th, 2020 by Saurenergy A special contribution from Tony Xu, President of Huawei Ascend Computing Business and Chen Guoguang, President of Huawei Smart PV Business, on the next big thing for PV’s. Artificial Intelligence, (AI) 1 AI Enables All Industries We are entering a fully connected, intelligent world. Over the last few years, AI has become a high-frequency word, […] Read more
Importance of Using Storage with Increasing Renewable Energy Updated On Wed, May 6th, 2020 by Saurenergy Background and Context The Government of India has announced ambitious targets for Renewable Energy (RE) capacity addition, and the Country is rapidly adding Wind and Solar generation in the energy mix. However, there are some well accepted issues associated with RE power – such as intermittency, fluctuations owing to weather changes, and limited forecasting/ scheduling […] Read more
IEX Reports 6.6 Percent Decline in Power Trade in April 2020 Updated On Wed, May 6th, 2020 by Saurenergy IEX has stated that its electricity market saw a trade of 4052 MU in the month of April 2020, witnessing a decline of 6.6 percent YoY. The Indian Energy Exchange (IEX), the country’s premier energy exchange platform has stated that the electricity market at IEX saw a trade of 4052 MU in the month of […] Read more
ICRA Stands in Favour of Draft Amendments Proposed in Electricity Act Updated On Wed, May 6th, 2020 by Saurenergy ICRA believes that the draft amendments proposed in the Electricity Act can strengthen the sanctity of power supply contracts and bring reforms in the distribution segment. ICRA Limited, an independent investment information and credit rating agency, has stated that it believes that the draft amendments proposed in Electricity Act, 2003 have the scope to strengthen […] Read more
Renewables Unaffected as Thermal Generation Suffered Amid Lockdown: India Ratings Updated On Wed, May 6th, 2020 by Saurenergy The decrease in demand has seen electricity generation from all sources (excluding renewables) take a hit in March 2020 with thermal generation at the front. According to a new analysis, the power demand in India declined for March and April amid the COVID-19 led lockdown, however, with the decrease in demand, electricity generation from all […] Read more
BHEL Opens Tender for Global OEMs to Setup Facilities in India Updated On Mon, May 4th, 2020 by Saurenergy The ongoing coronavirus crisis has raised the wakeup call for global economies to diversify the manufacturing activities, which are concentrated in a single location from a long time. Thus, the situation has thrown up the need in front of global Original Equipment Manufacturers (OEMs), which are largely in China and other countries, to diversify their […] Read more
Peak Power Demand Still Down in May, Struggling at 134.7 GW Updated On Mon, May 4th, 2020 by Saurenergy The peak power demand in India has remained low at 134.7 GW, being down by over 26 percent so far in May despite the easing of the nationwide lockdown The peak power demand in India has remained low at 134.7 GW, being down by over 26 percent so far in May. The low has been […] Read more
SECI’s 2GW ISTS-Connected Wind Projects Tender to Close on May 06 Updated On Fri, May 1st, 2020 by Saurenergy State-owned Solar Energy Corporation of India Ltd’s (SECI’s) tender for 2 GW (or 2,000 MW) inter-state transmission system (ISTS) connected wind power projects in India under tariff-based competitive bidding (Tranche-IX) will be closed on May 06, 2020. Thus, interested bidders can submit their bids on or before May 06, 2020, by 6:00 p.m. Also, SECI […] Read more