Mainspring Launches new Power Generation Technology; Announces $150 Mn Agreement with NextEra Updated On Wed, Mar 10th, 2021 by Saurenergy Mainspring Energy has launched the Mainspring Linear Generator, the first product in a new category of power generation technology for commercial and industrial buildings, utilities, and microgrids. The growing mandate for a reliable, affordable, and low-carbon electric grid is driving demand for new power generation technologies that can enable greatly increased use of renewable energy […] Read more
Project Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Responsible for operational level understanding of the requirement of the client/customer, Site Visits, Site feasibility & Solar Systems Design and complete execution. Able to check site […] Read more
Design Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Create plans for solar energy system development, monitoring, and evaluation activities. Prepare detailed work plans. Conduct engineering site audits to collect structural, electrical, and related site […] Read more
O&M Engineer-Solar PV Plant Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 3 years of experience, preferably in the area of Solar PV Power plants and projects. Qualification: BE/ Diploma – Electrical, Electrical preferable Location: Pune Key Responsibilities / Accountabilities: Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as […] Read more
Average Rural Power Supply Duration has Increased to 18.5 Hours Updated On Fri, Mar 5th, 2021 by Saurenergy RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in 2019-20. Addressing the Power Ministry Parliamentary Consultative Committee in a meeting, Power Minister RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in […] Read more
SECI Issues RfS for its 1785 MW Solar Tender in Rajasthan (Tranche – IV) Updated On Fri, Mar 5th, 2021 by Saurenergy SECI has issued the RfS document for the selection of SPDs for setting up 1785 MW solar PV projects in Rajasthan (Tranche-IV). The Solar Energy Corporation of India (SECI) has now issued the Request for Selection (RfS) document for the selection of Solar Power Developers (SPDs) for setting up 1785 MW grid-connected solar PV power […] Read more
Karnataka Issues Renewable Energy Policy 2021-26, Targets 20 GW of RE Projects Updated On Fri, Mar 5th, 2021 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has drafted the “Karnataka Renewable Energy Policy 2021-26” to strengthen the Renewable Energy markets in the state. Being one of the leading States in Renewable Energy (RE) sector in the country with a RE generation capacity of about 15,037 MW, the KREDL has drafted the policy with a foremost […] Read more
Sun Engineers : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site installation, repair, maintenance, oversight, and modifications as required Work directly with client personnel and, as directed, third-party vendors to […] Read more
As Solar Spreads, Shrinking Space for Wind Updated On Wed, Mar 3rd, 2021 by Saurenergy It was one of the lesser noticed misses caused by the 2020 pandemic. In fact, we had predicted it in our own January 2020 issue. When Solar capacity would overtake wind in India. But come 2021, and wind energy has finally been overtaken. The news, when it was finally confirmed, couldn’t have been announced with […] Read more