Top 3 Transcontinental Solar Energy Transmission Projects Updated On Tue, Nov 23rd, 2021 by Saurenergy Back in October 2018, when Prime Minister Narendra Modi first articulated the idea of One World One Sun One Grid (OWOSOG), perhaps even he wouldn’t have expected the progress the idea has made since. Besides being announced formally as an objective at the COP 26 meet recently, the idea of OWOSOG has made enough progress […] Read more
TATA Projects Bags 120 km Transmission Line Project in Bangladesh Updated On Fri, Nov 12th, 2021 by Saurenergy TATA Projects Limited, an Indian infrastructure company, has announced that it has forayed into Bangladesh’s Transmission and Distribution (T&D) sector by securing a 400 KV double circuit transmission line project valued at approximately INR 900 crore (USD 120 million) from Power Grid Company of Bangladesh Limited (PGCB). This 120-km length project from Barapukuria to Bogura […] Read more
Design Engineer (Axle/Transmission/Gearbox) Updated On Mon, Oct 25th, 2021 by Saurenergy Experience in design & Development of Synchro, Powershift, automatic transmissions for Off highway systems Experience in Axles, PTO & transferase design for Off highway systems Knowledge of Torque Power flow in transmission/axle driveline Ability to perform fundamental mechanical engineering calculations. Strong in CAD software Creo (ProE) Understanding of material properties & Manufacturing process. Design support […] Read more
Sterlite Power Wins Nangalbibra-Bongaigaon ISTS power transmission bid In North-East Updated On Mon, Oct 18th, 2021 by Saurenergy Sterlite Power, a leading private sector power transmission infrastructure developer and solutions provider, has been awarded the Nangalbibra─Bongaigaon inter-state power transmission project worth INR 324 Cr through tariff-based competitive bidding (TBCB) by virtue of emerging as the L1 bidder. The project elements consist of a new 220/132 kV substation at Nangalbibra and laying of ~130 km […] Read more
Transmission System for Rajasthan Solar Energy zone commissioned Updated On Thu, Oct 7th, 2021 by Saurenergy POWERGRID Khetri Transmission System Ltd. (PKTSL), a fully owned subsidiary of Power Grid Corporation of India Limited (POWERGRID) has commissioned the Transmission System associated with Rajasthan Solar Energy Zone (SEZ) Part-C on 4th October 2021. This is one of the largest Inter State Tariff Based Competitive Bidding (TBCB) projects established in the state of Rajasthan. The […] Read more
New Electricity Rules Make Transmission Access Simpler Updated On Tue, Oct 5th, 2021 by Saurenergy The Ministry of Power (MoP) has released the Electricity (Transmission System Planning, Development and Recovery of Inter-State Transmission Charges) Rules 2021, which are aimed at allowing power sector utilities easier access to the electricity transmission network across the country. Transmission system is the vital linkage in the power sector value chain connecting generation and demand. […] Read more
Hitachi ABB Power Grids Commissions UHVDC Transmission Link in India Updated On Wed, Jul 28th, 2021 by Saurenergy Hitachi ABB Power Grids in India has announced the successful commissioning of one of India’s longest ultra-high voltage direct current (UHVDC) transmission links for Power Grid Corporation of India Limited. A +/-800 kilovolt (kV), 6,000MW transmission link that connects Raigarh, Chhattisgarh, with Pugalur, Tamil Nadu, and stretches over 1,800 kilometers. Notably, this transmission link can […] Read more
Researchers Create 68.9%-efficient PV Cell for Laser energy Transmission Updated On Thu, Jul 1st, 2021 by Saurenergy At the recently held 48th IEEE Photovoltaic Specialists Conference, researchers from the Fraunhofer Institute for Solar Energy Systems ISE presented their achievement of a record conversion efficiency of 68.9% for a photovoltaic cell under monochromatic laser light. The scientists at Fraunhofer ISE claimed the success, explaining that it was made possible with a special thin […] Read more
Transmission Policy Would Unlock Clean Energy Growth: ACEG Updated On Wed, May 12th, 2021 by Saurenergy Building just 22 high-voltage transmission lines that are currently on hold in the US could increase national wind & solar generation by 50% Building just 22 high-voltage transmission lines that are currently on hold in the US could increase national wind and solar generation by 50 percent and create approximately 1.2 million jobs, according to […] Read more