India Reduces AT&C Losses From 22.62% To 15.40% In 10 Years: Minister Updated On Tue, Jul 30th, 2024 by Saurenergy India’s renewable energy installed capacity has recently surged to 4,46,190 MW in June 2024, up from 2,48,554 MW in March 2014, according to data shared by Minister of State for Power, Shripad Naik. In a written reply to the Parliament, the Minister noted: “India’s total installed capacity has increased from 2,48,554 MW in March 2014 […] Read more
Offshore Wind Power Emerges Out of Shadows Updated On Tue, Jul 30th, 2024 by Saurenergy The world of renewable energy is diverse, including solar, hydroelectric, geothermal, and biomass. Among these, wind power is among the most efficient and scalable clean energy sources. Offshore wind energy farms promise higher energy yields and are far from residential areas, reducing noise and visual impact. As technology advances and costs drop, offshore wind power […] Read more
India To See 9.17% Growth In EV Sector Workforce: TeamLease Updated On Tue, Jul 30th, 2024 by Saurenergy TeamLease’s recent survey points towards a transition in the employment structure within the power and energy sector, particularly in the electric vehicle (EV) segment from April-September 2024-2025. TeamLease presented its ‘Employment Outlook Report’ for the first half of the fiscal year 2024-25 where it analyzed data from a wide-ranging survey of 1,417 employers across 23 […] Read more
JSW Neo Secures 192 MW Hybrid Power Project From GUVNL Updated On Mon, Jul 29th, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), received a Letter of Intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL), for a 192 MW grid-connected hybrid power project, including an additional 96 MW under the green shoe option. JSW Neo Energy, a subsidiary of JSW Energy was awarded this project against a tariff-based competitive bid invited […] Read more
BrightNight Australia Links Mortlake Energy Hub To National Grid Updated On Wed, Jul 24th, 2024 by Saurenergy Australian Energy Market Operator (AEMO) recently approved the connection of BrightNight’s 360 Mega Watt (MW) Mortlake Energy Hub (a hybrid renewable energy project) to the National Electricity Market, to support Australia’s decarbonization efforts. Australia wants to go net-zero by 2050 and has plans to ensure 82% electricity capacities in their grid from renewable sources by […] Read more
Senior Electrical Engineer (Primary Substation Design) Updated On Tue, Jul 23rd, 2024 by Saurenergy Principal Duties and Responsibilities:- Design (Concept, FEED and Detail Design) of Transmission and Distribution Systems upto 400kV – for Utility Companies based on International standards – for US, UK, Europe, Middle East and South East Asia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , WIND,BESS, Transmission line projects will […] Read more
Hartek Secures 765kV Projects From PGCIL In Indore, Kurnool Updated On Wed, Jul 17th, 2024 by Saurenergy Hartek Group has secured multiple 765kV projects from the Power Grid Corporation of India Ltd. (PGCIL). The key orders include supplying and commissioning high-voltage transmission projects at Indore and Kurnool. These projects can help to enhance power system reliability and boost transmission capacity to power-deficit regions. With large power generation projects expected until 2030, these […] Read more
5 Key Points for India on the Road to 300 GW Solar by 2030 Updated On Tue, Jul 16th, 2024 by Saurenergy India missed its 2022 goal of achieving 100 GW of installed solar capacity. The fact that this target is still unmet highlights the need for significant efforts to overcome various challenges if the country is to realize its vast solar potential. This is even more important considering last year’s government resolution of adding 50 GW […] Read more
India’s Solar Journey: 5 Speed Breakers on the Journey to 100 GW and Beyond Updated On Mon, Jul 15th, 2024 by Saurenergy India has enormous solar potential due to its geographical conditions. The country’s total solar energy capacity recently surpassed 85 Gigawatts (GW), which is about 11 percent of its total solar potential of 748 GW, as assessed by the National Institute of Solar Energy (NISE). Ironically, the country had set a target of 100 GW of […] Read more