AGM – Power Evacuation Updated On Mon, Nov 4th, 2024 by Saurenergy An electrical engineer from well recognized institutions ( NIT’s or equivalent) with experience on the eBoP (electrical balance of plant) systems of wind/solar renewable sector. RESPONSIBILITIES:- Detailed engineering, Project planning & Management:- Electrical Balance of plant pertaining to Sub-station (up to 400 KV), Switching stations, and related transmission lines, from concept till commissioning of wind […] Read more
SECI Tenders For 1.2 GW RTC Renewable Energy Projects Across India Updated On Mon, Nov 4th, 2024 by Saurenergy SECI, has issued a tender to select renewable power developers to supply 1.2 GW of Round-the-Clock (RTC) power for renewable projects across India. The last date for bids submission is 16th December. With a commissioning time of 24 months, the 4 hour RTC supply will need to maintain a Demand Fulfillment Ratio (DFR) of 80% […] Read more
Powering India’s Net-Zero: Navigating Challenges in Renewable Integration Updated On Mon, Nov 4th, 2024 by Saurenergy India’s journey to a net-zero energy future demands an extensive transformation in its power market. As the country intensifies efforts to increase renewable energy (RE) capacity and to realise its 2030 and later net zero goals, numerous challenges—structural, financial, and operational—are emerging, presenting formidable obstacles to integrating a growing share of RE into the national […] Read more
More Actions Needed To Achieve Net-Zero Targets: Wood Mackenzie Updated On Wed, Oct 30th, 2024 by Saurenergy A string of global shocks has likely put 2030 emissions reduction targets out of reach. But with decisive action, there is still time to reach net zero emissions by 2050, according to Wood Mackenzie’s Energy Transition Outlook report, an assessment of the global journey towards a lower-carbon future. The new report analyses four different pathways […] Read more
IFC Partners With ACWA Power to Support Uzbekistan’s Energy Transition Updated On Wed, Oct 30th, 2024 by Saurenergy IFC announced today a $240 million Islamic Equity Bridge Loan (EBL) financing for ACWA Power to support the development of Uzbekistan’s renewable energy sector on the sidelines of the 8th Future Investment Institute conference at Riyadh in Saudi Arabia. IFC’s financing will support the construction and operation of two projects, with a cumulative capacity of […] Read more
NTPC Plans To Develop 300 MW Solar Project, Issues Tender Updated On Mon, Oct 28th, 2024 by Saurenergy NTPC recently released a tender to develop a 300 MW ground-mounted solar project and terminal bay near the NTPC Anta substation. It is accepting bids until 5th December 2024. The bidder will be responsible for arranging the land for the solar project and for the design, engineering, manufacturing, transportation, storage, installation, and commissioning of the […] Read more
Rajasthan’s New ‘RIPS’ Scheme Aims To Expedite RE Investments Updated On Wed, Oct 23rd, 2024 by Saurenergy In a pursuit to expand its renewable energy capacity, the Rajasthan government, released its Rajasthan Investment Promotion Scheme (RIPS). It intends to capitalize on an average of 300 to 325 sunny days each year with 24.22 GW solar energy and 5.19 GW wind energy. This scheme envisions to build on the state’s strengths in renewable […] Read more
Sharp Fall In BESS Tender Bids Signals Faster Energy Storage Additions In India Updated On Mon, Oct 21st, 2024 by Saurenergy In the past three months multiple BESS (Battery-based Energy Storage system) tender results have pointed to yet another mini-disruption in the fast-evolving Indian renewable energy sector. Energy storage targets for 2028 might be a lot closer in 2026 itself. The price drops have been attributed primarily to falling lithium cell costs, which have led to […] Read more
Gujarat Set To Build Its First Long Duration BESS Updated On Mon, Oct 21st, 2024 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL), the state electricity regulatory body, has taken the first step to transition from a battery energy storage project to developing its first Long Duration Energy Storage System (LDES) in Gujarat. It has released a draft tender to select developers for an 800 MW (200 MW x 8 Hrs) battery […] Read more