2023’s Promise for Solar. Will India Rise To The Challenge? Updated On Mon, Jan 23rd, 2023 by Saurenergy Early into 2023, the ground is set for a momentous shift for solar. But first, the numbers. In the Jan-Dec period, figures from India’s Central Electricity Authority show that the country added 13956 MW of solar capacity, of which just over 11 GW was utility scale solar. This is by far the best ever performance […] Read more
Revolutionizing Solar Energy Integration: The MARS Project and Electric Grids Updated On Mon, Jan 23rd, 2023 by Saurenergy A new era of energy systems dominated by green and renewable solar power is approaching. As the transition comes to fruition, it’s important to understand the type of current the grids use – Alternating Current (AC) – and to ensure solar integration without much hassle. Despite its benefits, solar energy involves a complex and lengthy […] Read more
Hyderabad’s Greenko to Set Up Pumped Storage Project of 11 GWh in Madhya Pradesh Updated On Tue, Jan 10th, 2023 by Saurenergy Hyderabad-based clean energy firm Greenko Group is set to invest Rs 10,000 crores in a Pumped Storage Project (PSP). The storage project is to be established near Gandhi Sagar in the Neemuch district of Madhya Pradesh. At present, the firm delves into both wind and solar of capacity of more than 500 MW. These are […] Read more
CERC Approves Tariff For SECI’s 1200 MW RTC Power Project Updated On Tue, Jan 10th, 2023 by Saurenergy SECI’s landmark RTC tender for green energy has received formal CERC approval for tariff adoption and trading margins. SECI had issued a tender in 2019 for “Round-the-Clock” supply of 400 MW ISTS-connected Renewal Energy project with assured peak power supply in India under tariff based competitive bidding. SECI recently filed a petition with CERC for […] Read more
Bihar (BERC) Gives Green Signal to 600 MW Solar Purchases From SECI Updated On Mon, Jan 2nd, 2023 by Saurenergy The Bihar Electricity Regulatory Commission (BERC) has given nod to procurement of 600 MW of solar power from Solar Energy Corporation of India (SECI) in Tranche-VIII by the distribution companies (DISCOMS). BERC has allowed the procurement at a tariff of Rs 2.50/kWh. The trading margin has been kept by the regulator at Rs 0.07 for […] Read more
The Power Ministry Report Card For 2022- Renewables Push, Reforms Lead Agenda Updated On Mon, Jan 2nd, 2023 by Saurenergy When it comes to energy and its countrywide distribution, the Power ministry is the responsible limb of the government. We look at the growth of clean energy and its distribution in India, while also assessing the various measures taken to promote clean energy in the seventh-largest country in the world. India is the world’s third […] Read more
Electro-Mechanical Design Engineer – Power Quality Solutions Updated On Tue, Dec 20th, 2022 by Saurenergy Responsibilities:- Preparation of PQS Plant Layout (Yard Arrangement – Layout & Plan, Electrical HV / EHV Clearance Check) Preparation of Civil Task (Civil input) Drawings (Foundation, Conduit, Trench, and other civil Requirements) Preparation of Civil Conceptual Design Preparation of PQS Control Building Layout (Electrical Cubicles, Thyristors, Pump skid Arrangement) Preparation of Cable Trench & Conduit […] Read more
KEC International Adds To Order Book, Including 500 MW Solar Project Updated On Tue, Dec 20th, 2022 by Saurenergy After it won new orders worth ₹1,313 crore across its various verticals, manufacturer of electric power transmission towers, KEC International, saw its shares surge at 7 per cent to Rs 501 on the BSE. The new orders have augmented the firm’s year to date order intake to more than Rs 13,000 crore. With such strong […] Read more
CERC Rejects Windpower Windfarm’s Grounds for Failure to Commission Project Updated On Thu, Dec 15th, 2022 by Saurenergy A petition filed by Airpower Windfarms, contending that because the Gujarat Energy Development Authority (GEDA), refused to extend the developer permissions, it was unable to commission its project, has been turned down by the Central Regulatory Electricity Commission (CERC). The firm said that it was granted Stage-I Connectivity on 13.7.2018 and Stage-II Connectivity on 24.8.2018 […] Read more