Saft Uses Nickel Technology In Backup Batteries For J&K Rail Tunnels Updated On Tue, May 28th, 2024 by Saurenergy Saft, a subsidiary of TotalEnergies, delivered backup batteries for critical safety systems in tunnels along a new stretch of the Udhampur-Srinagar- Baramula Rail Link (USBRL). This battery is used between Banihal and Sangaldan towns in the Kashmir valley. Prime Minister Narendra Modi opened the new section of the USBRL in February 2024, laying importance on […] Read more
Hitachi Energy To Build HVDC Link To Connect Tasmania To Mainland Grid In Australia Updated On Tue, May 28th, 2024 by Saurenergy Marinus Link Pty Ltd (MLPL) has selected Hitachi Energy to supply a high-voltage direct current (HVDC) project, which will augment the connection between mainland Australia and Tasmania’s grid. The approximately 345-kilometer cable route HVDC system will enable the flow of renewable power in both directions between the Victorian and Tasmanian states. For the first time […] Read more
Avaada, Apraava, ReNew & JSW Bag NTPC’s 1.5 GW Solar Contract Updated On Fri, May 24th, 2024 by Saurenergy Indian power behemoth NTPC recently awarded the contracts to four developers to setup its 1,500 MW of solar project. The Indian Renewable Energy Implementing Agency recently announced the results of its tender, floated earlier. The tender was meant for Inter-State Transmission System (ISTS) through these new proposed solar projects. Based on the reverse competitive bidding, […] Read more
GIB Row: CERC Grants Compensation To PFC In Case Involving Adani Green Updated On Wed, May 15th, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) in its latest judgement allowed compensation to Fatehgarh Bhadla Transmission Limited (FBTL) due its increased project cost due to the Great Indian Bustard (GIB) row. FBTL is a Special Purpose Vehicle (SPV) of the PFC Consulting Limited. It was created to develop a transmission system for ultra mega solar […] Read more
Grid Optimization: Heimdall Power’s Magic Balls Make A Mark Updated On Wed, May 15th, 2024 by Saurenergy As our energy demands evolve and renewable sources become increasingly integrated into our power networks, the need for innovative solutions to optimize grid performance has never been more pressing. Especially with higher injections of variable renewable energy, grid optimisation has never been more important. The new form of cutting-edge technologies, from advanced sensors and smart […] Read more
HPCL Issues 300 MW EPC Tender For Solar Projects Updated On Tue, May 14th, 2024 by Saurenergy Hindustan Petroleum Corporation subsidiary HPCL Renewable and Green Energy (HPRGEL) has issued a tender inviting bids for 300 MW of interstate transmission system (ISTS)–connected solar power projects in seven states. The tender pertains to the engineering, procurement, and construction (EPC) package. The last day to submit the bids is May 30, 2024, and the bids […] Read more
Ukraine Receives Grant From Germany To Restore Energy Infra Updated On Fri, May 10th, 2024 by Saurenergy Ministry of Energy of Ukraine has received a €45 million grant from Germany, to restore the energy sector after Russian attacks on energy infrastructure. Volodymyr Kudrytskyi, Chairman of the Board of National Power Company Ukrenergo a state-owned company managed by the Ministry of Energy (NPC) Ukrenergo, signed a document authenticating the management decision taken by […] Read more
Tata Power Results In Line With Expectations, Q4 Profits Up 18% Updated On Wed, May 8th, 2024 by Saurenergy Tata Power has announced its Q4 results. During the year, the firm owned its highest-ever PAT of ₹ 4,280 crore and Revenue of ₹ 61,542 crore for FY24 Q4 FY24 PAT up 18% to ₹ 1,109 crore, making it the 18th consecutive quarter of PAT growth During the quarter, the company’s renewables portfolio crossed the […] Read more
NTPC-REL Seeks Bids For 900 MW Project In Madhya Pradesh Updated On Fri, May 3rd, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC-REL) has invited online bids for land and power evacuation packages for a 900 MW ISTS-connected solar project In Neemuch region, Madhya Pradesh. NTPC-REL’s tender document mentioned that the project requires government/private contiguous land of 5 Acres/MW on a freehold/leasehold basis near Neemuch ISTS substation in Madhya Pradesh, the lease period […] Read more