Reshaping the Future of the Electric Grid Through Low-Cost, Long-Duration Discharge Batteries Updated On Thu, Mar 18th, 2021 by Saurenergy A new era of energy provided by renewables may be close, thanks to research begun at the Joint Center for Energy Storage Research (JCESR), a U.S. Department of Energy (DOE) Energy Innovation Hub led by DOE’s Argonne National Laboratory, and continued at its spinoff company, Form Energy. The challenge JCESR addressed is long-duration energy storage – […] Read more
Project Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Responsible for operational level understanding of the requirement of the client/customer, Site Visits, Site feasibility & Solar Systems Design and complete execution. Able to check site […] Read more
O&M Engineer-Solar PV Plant Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 3 years of experience, preferably in the area of Solar PV Power plants and projects. Qualification: BE/ Diploma – Electrical, Electrical preferable Location: Pune Key Responsibilities / Accountabilities: Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as […] Read more
Average Rural Power Supply Duration has Increased to 18.5 Hours Updated On Fri, Mar 5th, 2021 by Saurenergy RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in 2019-20. Addressing the Power Ministry Parliamentary Consultative Committee in a meeting, Power Minister RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in […] Read more
Karnataka Issues Renewable Energy Policy 2021-26, Targets 20 GW of RE Projects Updated On Fri, Mar 5th, 2021 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has drafted the “Karnataka Renewable Energy Policy 2021-26” to strengthen the Renewable Energy markets in the state. Being one of the leading States in Renewable Energy (RE) sector in the country with a RE generation capacity of about 15,037 MW, the KREDL has drafted the policy with a foremost […] Read more
Sun Engineers : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site installation, repair, maintenance, oversight, and modifications as required Work directly with client personnel and, as directed, third-party vendors to […] Read more
As Solar Spreads, Shrinking Space for Wind Updated On Wed, Mar 3rd, 2021 by Saurenergy It was one of the lesser noticed misses caused by the 2020 pandemic. In fact, we had predicted it in our own January 2020 issue. When Solar capacity would overtake wind in India. But come 2021, and wind energy has finally been overtaken. The news, when it was finally confirmed, couldn’t have been announced with […] Read more
The Hydrogen Roadmap to 2030. Updated On Tue, Mar 2nd, 2021 by Saurenergy Underpinned by a global shift of regulators, investors, and consumers towards decarbonisation, Hydrogen (H2) is receiving unprecedented interest and investments. And a new report developed collaboratively by the Hydrogen Council and McKinsey & Company, has tried to provide an overview of these developments in the hydrogen ecosystem. The report ‘Hydrogen Insights: A Perspective on Hydrogen […] Read more
Neoen Completes Financing for 300 MW Victorian Big Battery in Australia Updated On Mon, Mar 1st, 2021 by Saurenergy Neoen has announced that it has achieved financial close on the Victorian Big Battery, a 300 MW / 450 MWh battery storage facility in Victoria Neoen has announced that it has achieved financial close on the Victorian Big Battery, a 300 MW / 450 MWh battery storage facility located near Geelong, in Victoria. The project […] Read more