KPI Green Gets Commissioning Certificates from GEDA for 26.10 MW Hybrid Power Project Updated On Thu, Jun 8th, 2023 by Saurenergy Gujarat-based KPI Green Energy, which develops, builds, owns, operates, and maintains solar power plants as an independent power producer and captive power producer has announced receiving commissioning certificates from GEDA (Gujarat Energy Development Agency). The firm has commissioned 26.10 MW wind-solar hybrid power project. The hybrid project comprises of 16.10 MW capacity of wind while […] Read more
Inox Wind Wins 100 MW Project from ABEnergia Renewables Updated On Thu, Jun 8th, 2023 by Saurenergy Wind energy solutions provider, Inox Wind has won an order for a 100 MW wind power project from ABEnergia Renewables Pvt Ltd (ABEnergia), an IPP (Independent Power Producer). Inox Wind will be responsible for the supply and installation of state-of-the-art, new generation 3.3 MW wind turbine generators with 145 m rotor diameter and 120 m […] Read more
Canadian Solar To Help Deliver 99 MWh of BESS in UK Updated On Fri, Jun 2nd, 2023 by Saurenergy Global renewable energy conglomerate Canadian Solar has said that CSI Energy Storage has entered into an agreement to deliver 49.5MW/99MWh of turnkey battery energy storage solutions to European solar and storage player Cero Generation and Enso Energy in the United Kingdom. The energy storage infrastructure is taking speed as the country looks for faster energy […] Read more
Principal Designer – Dry Utilities Updated On Wed, May 31st, 2023 by Saurenergy AECOM is seeking a Principal Designer- Dry Utility(Electrical Infrastructure) to be based in Bengaluru, KA, India. Candidates will be responsible for the following activities: 10-14 Years (Preferred Middle East and outside India projects Preparing electrical drawings including SLD, schematic, Layout and 3D modelling for Electrical, Telecom, and Street lighting networks. Exposure to Pump station, Water […] Read more
Regional Programmes Head SIDS (P3) Updated On Tue, May 30th, 2023 by Saurenergy Reporting to the Chief of Unit Programmes & Project Implementation or a designated officer, you will identify strategic program and project implementation opportunities for ISA in this sector (within SIDS). You will lead the identification, building, and establishment of partnerships, the preparation of funding proposals, organize and participate in meetings and workshops, and support the […] Read more
Associate Project Engineer – C & P Hardware Design Engineer Updated On Mon, May 29th, 2023 by Saurenergy As a Hardware Design Engineer with us, you will join an aspiring team that works with the HVDC Power transmission links. The HVDC technology has been on the market for the past 60 years and is used to transmit power over long distances with minimal losses, using overhead lines, underground and submarine cable systems. Please […] Read more
Supplier Quality-Electrical Engineer Updated On Thu, May 25th, 2023 by Saurenergy Develop Inspection Requirement for Electrical & Instrumentation items based on Tech specification and CodeRequirement Independently Conduct Kick-off- meeting & Pre-Fabrication meeting with Supplier. Review supplier quality related documents like, Inspection test Plan, FAT procedure, Inspection procedures, Test reports on the project to ensure compliance with the project quality program/plan. Should be familiar with various international […] Read more
MNRE, States Discuss Ways To Achieve 500 GW Renewable Target Updated On Wed, May 24th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) discussed with different states in the national capital to review the progress of various renewable energy programmes in the country. In its brainstorming session, the ministry told the states that India had already achieved 172 Gigawatt (GW) of renewable energy while works are in different stages to […] Read more
Bangladesh Opens Up Small, But Profitable Opportunity Next Door For Indian Developers Updated On Fri, May 19th, 2023 by Saurenergy Of late, Bangladesh, powered mostly by thermal power and blessed with an unfavourable location for hydropower, has made a serious effort to ramp up its renewable capacity. The country, which has a deficit of power supply that forces it to import from India, hopes that by 2041, 40 per cent of its total power requirements […] Read more