Gujarat Set To Build Its First Long Duration BESS Updated On Mon, Oct 21st, 2024 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL), the state electricity regulatory body, has taken the first step to transition from a battery energy storage project to developing its first Long Duration Energy Storage System (LDES) in Gujarat. It has released a draft tender to select developers for an 800 MW (200 MW x 8 Hrs) battery […] Read more
BMS EDU – Electrical and Validation Updated On Fri, Oct 18th, 2024 by Saurenergy EDU to take charge of a multi-disciplinary team to design traction and auxiliary energy storage systems for railway applications including introduction of advanced chemistry cell technologies. He manages the resources required to execute design engineering activities of energy storage solutions domain: functional description, system engineering, system architecture, power design, mechanical design, thermal design, battery management, embedded software, […] Read more
Maharashtra: JSW Energy Signs Pact For 1200 MW Hybrid Projects Updated On Fri, Oct 18th, 2024 by Saurenergy JSW Renew Energy Six Limited and JSW Renew Energy Thirty Limited, stepdown subsidiaries of JSW Energy Limited have signed Power Purchase Agreements (“PPAs”) with Maharashtra State Electricity Distribution Company Ltd (“MSEDCL”) for STU-connected Solar-Wind Hybrid Capacity. The company has signed PPAs for two hybrid projects, each with a capacity of 600 MW, totalling 1,200 MW. […] Read more
Trina Solar, EGO Sign Pact To Boost Utility-Scale Projects In Italy Updated On Fri, Oct 18th, 2024 by Saurenergy Trina Solar’s International Systems Business Unit, the utility-scale solar and battery storage project development arm of Trina Solar Co, Ltd, has signed a 15-year Power Purchase Agreement (PPA) with EGO, an Italian energy management company owned by the Shell Group. This contract encompasses nine projects, totaling 69 MWp located across various regions in Italy. These […] Read more
NTPC Announces Winners of 1200 MW Hybrid Tender Updated On Fri, Oct 18th, 2024 by Saurenergy NTPC LImited has now announced the winners of its 1200 MW solar-wind hybrid project tender. As per the details of the tender results, five companies won the tender in different capacities. The lowest bid for the tender was quoted by Rays Power, Refex Green and SAEL Limited. These firms quoted a price of Rs 2.50/kWh. […] Read more
MNRE Aims To Add More Vendors For PM Surya Ghar, Issues EOI Updated On Fri, Oct 18th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has now planned to boost the network of registered vendors to expedite the growth of residential rooftop installations. The ministry is now trying to spur the growth of solar installations through its PM Surya Ghar scheme where it has planned to install rooftop solar in one crore […] Read more
Component Engineer – Steam Turbine Parts Engineering Updated On Thu, Oct 17th, 2024 by Saurenergy Support in Steam turbine capital, spare parts, and repair business. Understanding of Steam turbine components such as Blades, casing , Guide blade carrier , and Rotor etc.. Localization of parts, vendor development and qualification for manufacturing of parts and raw materials. Ability to Create and evaluate technical drawings, specifications, and documentation. Support to the site […] Read more
Design Leader – Electrical Distribution & E-house | REP APAC Updated On Thu, Oct 17th, 2024 by Saurenergy Mission:- As part of a project team:- Acts as the leader of the technical content of the assigned customer project(s) and/or workpackage(s), and functionally reports to Technical Senior Engineer responsible for the whole technical scope of customer projects. Makes sure customer technical requirements are fulfilled (in terms of performance, quality, costs and time), in compliance […] Read more
Microsoft, Google, and Now Amazon- Is Nuclear Hip Again? Updated On Thu, Oct 17th, 2024 by Saurenergy Last month, on September 20 came the news that Microsoft and Constellation Energy, the utility that owns Three Mile Island nuclear power facility, have inked a deal that would help restart Unit 1 at the Three Mile Island Nuclear Generating Station. the deal marked the first time a shuttered nuclear plant in the US was […] Read more