Rooftop Power Plants Can Save 95 Percent on Bills, Says Study Updated On Wed, Jul 4th, 2018 by Saurenergy Residents buying power from a community rooftop solar PV plant, via a subscription plan, could also save up to 35% on their electricity bills. These savings have been estimated over the 25-year lifetime of these systems. Households owning rooftop solar systems could save up to 95% on their electricity bills, says an independent study released at the CEEW Renewable Energy Dialogue […] Read more
Delhi Gurudwara Gets 1.5 MWp Rooftop Solar PV Plant Updated On Thu, Jun 21st, 2018 by Saurenergy “India is making rapid strides in the field of renewable energy and we will overshoot the target of 175 GW renewable energy by 2022,” says RK Singh. In the presence of Power and New & Renewable Energy Minister RK Singh a 1.5 MWp rooftop solar photovoltaic (PV) plant has been commissioned at the Gurdwara Rakab […] Read more
AP Tenders 15 MW of Rooftop Solar Projects Updated On Wed, Jun 13th, 2018 by Saurenergy The upper tariff cap for this tender has been fixed by NREDCAP at Rs 5 per KW, and the project size will vary from 50 KW to 500 KW. Any bidder can bid for a minimum of 1 MW and the maximum he can bid up to 5 MW. To be developed under the RESCO, […] Read more
AP: NREDCAP Issues Tender for 35 MW Rooftop Solar PV Plants Updated On Thu, Apr 19th, 2018 by Saurenergy The scope of work covers design, supply, installation, commissioning, maintenance, operation. It also includes wiring up from the SPV Rooftop system to Distribution Board. Under net metering policy of the state, New and Renewable Energy Development Corporation of Andhra Pradesh Ltd (NREDCAP) has announced a tender of grid-connected rooftop solar PV plants of 1 […] Read more
SETTING UP OF 500 MW ROOFTOP SOLAR PV PROJECTS: UPDATED LIST OF SUCCESSFUL BIDDERS IN PARTS A, B AND C OF RESIDENTIAL BUILDING Updated On Tue, Apr 3rd, 2018 by Saurenergy SETTING UP OF 500 MW ROOFTOP SOLAR PV PROJECTS: UPDATED LIST OF SUCCESSFUL BIDDERS IN PARTS A, B AND C Please find the updated list of successful bidders under PART-A, PART-B and PART-C of 500 MW Grid connected roof top scheme in CAPEX and RESCO model with Annexure-A of LoA. click here.pdf Read more
Vikram Solar Commissions 350 Kw Rooftop Solar Proj for Ordnance Factories’ Unit Updated On Wed, Mar 28th, 2018 by Saurenergy The Kolkata-based Gun and Shell Factory is a unit of the Ordnance Factories Board that manufactures special equipment for the Indian Army. Solar modules maker & EPC solutions provider Vikram Solar has commissioned a 350 Kilowatt rooftop solar power project for the Gun and Shell Factory (GSF) in Cossipore, Kolkata. The Kolkata-based Gun and Shell Factory is a […] Read more
Alec Energy to Construct 6.5 MW Solar Rooftop Project for Dubai Hills Mall Updated On Tue, Feb 20th, 2018 by Saurenergy Alec Energy will be responsible for the system design, sourcing local approvals and construction of the facility. Alec Energy, Alec Engineering and Contracting’s renewable energy unit, has signed off on a contract to construct a 6.5MW rooftop solar plant with Emaar Development for the Dubai Hills Mall project which is currently under construction. According to […] Read more
Solar Rooftop Products Must be Sustainable For 25 Years Updated On Wed, Jan 31st, 2018 by Saurenergy Since the PV systems need to make due for a long stretch, the item and parts must have a plan that has a venture life of no less than 25 years. The Center’s push towards rooftop solar power generation establishments has produced much enthusiasm among mortgage holders. Be that as it may, the absence of […] Read more
INTIMATION TO SUCCESSFUL BIDDERS/ DEVELOPERS : 1000MW GRID CONNECTED ROOFTOP SOLAR PV SYSTEM SCHEME (500MW CAPACITY PHASE-I) Updated On Mon, Jan 29th, 2018 by Saurenergy Intimation to Successful Bidders/ Developers : Implementation of 1000 MW Grid Connected Roof Top Solar PV System Scheme for Government Buildings in different States / Union Territory of India under CAPEX / RESCO Model (500MW Capacity PHASE – I) This has reference to the RfS documents (RfS No. SECI/C&P/MNRE/1000MW RT/IND/122016 dated 09.12.2016) for Implementation of […] Read more