The Top 5: Electric Two Wheelers Under ₹1,25,000 Updated On Wed, Jan 18th, 2023 by Saurenergy The age of EVs is here and talking about the Indian transition to this green mobility trend is incomplete without bringing into the picture substitutes for two ICE two-wheelers, one of the most important types of vehicles on Indian roads. However, affordability is important if electric two-wheelers (e2w) have to replace conventional options. Until December […] Read more
The Top 3 States With Biggest EV Subsidies In India Updated On Thu, Jan 12th, 2023 by Saurenergy India has been successful in spurring the Electric Vehicles trend in the country. While the central efforts were instrumental in this development, the contributions of various states in terms of subsidies have formed the backbone of EV adaptation as well. However, keep in mind that subsidies are unlikely to last very long, possibly not beyond […] Read more
Toyota Material Handling France & Alight Join Hands for Rooftop Solar Plant Updated On Wed, Jan 11th, 2023 by Saurenergy Toyota Material Handling France (TMHFR), a leading firm in materials handling equipment, has entered into a Power Purchase Agreement (PPA) with the solar energy firm Alight. Under the power purchase agreement (PPA), Alight provides solar energy to TMHFR at its facility in Bussy-Saint-Georges Paris, France. Alight develops, owns and manages the rooftop photovoltaic plant at […] Read more
The Top 5: Upcoming Electric Cars In India In 2023 Updated On Tue, Jan 10th, 2023 by Saurenergy India’s electric car market is likely to see more EVs this year than anytime before. With growth in EV battery technology and strong national commitments for 2030 and net zero by 2070, EV market is further set to share a considerable chunk of electric vehicle market of India. Amidst this continuation of EV surge, we […] Read more
Tamil Nadu Energy Development Agency Calls for 20 MW Rooftop Solar Bids Updated On Fri, Jan 6th, 2023 by Saurenergy A new tender for the installation and commissioning of 20 MW of grid-connected rooftop solar systems has been issued by the Tamil Nadu Energy Development Agency (TEDA). As per the notification, the installation will come on government buildings, state-run industrial facilities and educational institutions of Tamil Nadu. The developers can submit their bids by February 15, […] Read more
Trina Solar Maintains Its Top ranking in Bankability ratings Updated On Thu, Jan 5th, 2023 by Saurenergy Leading solar and tracker firm Trina Solar has maintained its AAA status for the third consecutive quarter in the PV ModuleTech bankability rankings released by PV Tech for Q4 2022. The company’s continued presence in the highest category validates its ongoing high performance level in manufacturing capacity, technology innovation, product shipments and financial status and […] Read more
Project /Site Engineer – Solar Rooftop Updated On Tue, Dec 27th, 2022 by Saurenergy The role holder will be responsible for project execution of Rooftop/ Ground-mounted Solar Projects in the KW to MW scale. Responsible for project management and monitoring of site construction activities as per project execution plan. Pre Construction:- Inception and Survey of plant Verification of Roof build Verification of plant Layout Verification of material Checklist During […] Read more
RVUNL Invites Bids for 810 MW STU Connected Solar Tender for RVUN Park, Bikaner Updated On Tue, Dec 27th, 2022 by Saurenergy To establish 810 MW of state transmission utility-connected solar power projects in RVUNL’s Ultra Mega Solar Park in Bikaner, Rajasthan Rajya Vidyut Utpadan Nigam (RVUNL) has requested bids from solar project developers. These projects will be built-own-operate projects. November saw the release of the tender, however, it was quickly withdrawn. The bids must be submitted […] Read more
GEDA Invites bid for 1.2 MW Solar Rooftop Plant Tender for District Hospital Updated On Mon, Dec 26th, 2022 by Saurenergy Goa Energy Development Agency (GEDA) has invited bids for 1.2 MW of grid-connected rooftop solar projects at North Goa and South Goa District hospitals, 600 KW for each. The last date to submit the bid is January 20, 2023, and the bids will be opened on the same day. This GEDA 1.2 MW of grid-connected […] Read more