Gujarat Urja Vikas Issues 750 MW Solar Tender Through Competitive Bidding Updated On Wed, Jul 13th, 2022 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL) has floated a tender for a 750 MW solar power project through competitive bidding process. The last date for submitting the online bid is August 23, 2022, till 5:00 pm and for the offline bid is August 25, 2022, at 05:00 pm. Bids will be opened on August 26, […] Read more
SECI Cancels 100 MW Getalsud Dam Floating Solar Tender Updated On Wed, Jul 13th, 2022 by Saurenergy Over two months after it first extended the deadline to respond to bidders, the Solar Energy Corporation of India (SECI) has cancelled the tender for the 100 MW Getalsud Dam project near Ranchi in Jharkhand. The cancellation follows a familiar pattern of challenges faced with floating solar tenders in India, where the standout success has […] Read more
Uttar Pradesh Invites E-Tender for 38 MW Of Solar PV System Updated On Tue, Jul 12th, 2022 by Saurenergy A tender for 38 MW of rooftop solar system has been floated by Uttar Pradesh New And Renewable Energy Agency (UPNEDA). This solar project will be executed under The Ministry of New and Renewable Energy (MNRE) GCRT Phase-2 scheme. The last date of submitting the bid is July 31, 2022 and the bid will open […] Read more
MSEDCL Issues Tender for Supply of 500 MW Solar Power Under PM KUSUM Updated On Mon, Jul 11th, 2022 by Saurenergy Maharashtra State Electricity Distribution Company Limited (MSEDCL) has invited the bids for a cumulative 500 MW (AC) solar power from the de-centralised solar project under the PM-KUSUM Yojna Component-C. This project will be developed in the Maharashtra state. The last date to submit bids of this 500 MW tender is July 29, 2022, till 04:00 […] Read more
National Thermal Power Corp Floats Two Tenders for Solar Cold Storages & Solar Water Pumps Updated On Fri, Jul 8th, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) has invited bids for two solar tender including solar-powered cold storage & solar-powered water pumps. Installation and Commissioning work of solar-powered cold storage will be in Senegal, Djibouti, Sudan, and Seychelles & solar-powered water pumps will be in Burundi, Ethiopia, Suriname, Mozambique, and Cuba. The last date to submit […] Read more
BHEL Issues Tender for Supply of 1 Crore MONO PERC Solar Cells Updated On Tue, Jul 5th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for a 1.027 crore MONO PERC solar cells supply. Tender is also including packing & transportation to as per incoterms, satisfactory completion of Supply of these cells. According to the tender, the output wattage of each PV cell should be 5.38Wp & has five busbars. Each cell […] Read more
Maharashtra Energy Development Issues 10 MW Rooftop Solar PV Tender Updated On Tue, Jul 5th, 2022 by Saurenergy Maharashtra Energy Development Agency (MEDA) has invited expression of interest (EoI) for discovering the tariff for the 10 MW Grid-Connected Rooftop Solar PV Systems under the RESCO model. This solar power plant will be installed on the State Government Sector Buildings terrace / Ground. The last date to submit the bid is July 18, 2022, […] Read more
Bihar Development Floated EOI Tender for Setting Up Manufacturing Unit Updated On Mon, Jul 4th, 2022 by Saurenergy Bihar Renewable Energy Development Agency (BREDA) has floated a tender for the empanelment of manufacturers of Luminary, Battery, and Solar PV modules for setting up the Manufacturing Unit. BREDA invites the bids through Expression of Interest (EOI). For participating in these Bihar Development tenders, the bidders need to fulfill the minimum eligibility criteria specified under […] Read more
Bangalore Metro Rail Floats Tender For 20 MW Of Grid Connected Rooftop Solar System Updated On Mon, Jul 4th, 2022 by Saurenergy Bangalore Metro Rail Corporation Ltd (BMRCL) has invited bids for a grid-connected rooftop solar photovoltaic system of 20 MW. This tender includes design, engineering, supply, construction, erection, testing, commissioning, and grid synchronization. The power developer will be responsible for O&M, warranty for 25 years under RESCO Model. The last date to submit the bid is […] Read more