Bihar Issues Tender To Build 116 MW Solar Project With 50.5 MW BESS Updated On Mon, Mar 3rd, 2025 by Saurenergy The Chief Engineer (Generation) of Bihar State Power Generation Company has issued an e-tender to select an EPC contractor for the development of a 116 MW (AC) solar project integrated with a 50.5 MW, 4-hour Battery Energy Storage System (BESS) (minimum 241 MWh capacity). The tender specifies that online submission will commence on March 19, […] Read more
NTPC REL Issues 900 MW Wind Energy Tender At Andhra Pradesh With BoS Package Updated On Mon, Mar 3rd, 2025 by Saurenergy NTPC Renewable Energy (NTPC REL), a subsidiary of NTPC, has issued a tender for the Balance of System (BoS) package of an ISTS-connected wind energy project with a nominal capacity of 900 MW at Anantapur in Andhra Pradesh. It is accepting bids until April 3, 2025. NTPC REL, in its brief scope of work, mentions […] Read more
ReNew, Enfinity, Serentica Among Winners of SJVN’s FDRE tender Updated On Sat, Mar 1st, 2025 by Saurenergy SJVN has announced the winners of its 1.2 GW Firm and Dispatchable Energy (FDRE) tender. As per the tender announcement, SJVN awarded the bids to ReNew Solar Power, EG Energy Development (Enfinity Global), Dineshchandra R Agrawal Infracon, Serentica Renewables India, and Tata Power Renewable Energy to develop 1,200 MW ISTS-connected projects for firm and dispatchable […] Read more
JSW Energy Wins 125 MW/500 MWh BESS Tender From SECI At ₹441,000/MW/Month Updated On Thu, Feb 27th, 2025 by Saurenergy JSW Energy has recently secured a 125 MW/500 MWh standalone battery energy storage system (BESS) tender from the Solar Energy Corporation of India (SECI). JSW won the tender at ₹441,000/MW/month. SECI floated this tender in December 2024 and declared it within two months. As per the tender, SECI, after receiving interest from the Kerala State […] Read more
NVVN Issues 250 MW/1000 MWh BESS Tender With VGF Support Updated On Tue, Feb 25th, 2025 by Saurenergy NVVN, a wholly owned subsidiary of NTPC Limited, has issued a tender for a 250 MW/1000 MWh standalone Battery Energy Storage System (BESS) with Viability Gap Funding (VGF) support. The tender includes a greenshoe option for an additional capacity of up to 250 MW/1000 MWh. It has set March 24, 2025 NVVN has been nominated […] Read more
SJVN Floats 375 MW/1500 MWh BESS Tender For UP Project Updated On Mon, Feb 24th, 2025 by Saurenergy SJVN has recently issued a tender seeking bids from developers to build a 375 MW/1500 MWh standalone Battery Energy Storage System (BESS) in Uttar Pradesh. The tender also offers Viability Gap Funding (VGF) under Tariff-Based Competitive Bidding (TBCB) on a Build-Own-Operate (BOO) basis. SJVN is accepting bids until March 28, 2025. The project aims to […] Read more
Karnataka: NTPC REL Opens 600 MW Solar, Power Evacuation Tender Updated On Mon, Feb 24th, 2025 by Saurenergy NTPC Renewable Energy has issued a Land and Power Evacuation Package tender to develop 600 MW ISTS-connected Solar projects in Tumkur Region, Karnataka. It has sought bids up till March 18, 2025. NTPC REL, a subsidiary of NTPC Green Energy latest tender expects the bidder to undertake land-related works such as providing an arrangement of […] Read more
Assam DISCOM Issues Tender For 134 MW Rooftop Solar Projects Updated On Thu, Feb 20th, 2025 by Saurenergy Assam Discom, Assam Power Distribution Company (APDCL) has recently released a tender to develop 134 MW Grid Connected rooftop solar (RTS) projects (without battery storage) on different Government Buildings under PM Surya Ghar: Muft Bijli Yojana. It is accepting bids till 11th March 2025 APDCL’s latest tender consists of three packages, it mentioned the project […] Read more
MoP Advises REIAs To Co-Locate ESS With Solar Plants In Upcoming Tenders Updated On Wed, Feb 19th, 2025 by Saurenergy The Ministry of Power (MoP) has released an advisory on the co-location of energy storage systems (ESS) with solar plants. Its latest advisory aims to incorporate a minimum of a 2-hour co-located Energy Storage System (ESS) equivalent to 10% of installed solar capacity in future tenders. The notification stated, “This requirement will help mitigate intermittency […] Read more