Signalling Principal Engineer Updated On Tue, Aug 24th, 2021 by Saurenergy As a key Member of the Wabtec Control Systems Team, the purpose of the Signalling Principal Engineer is to provide high level technical support and supervision in relation to design, checking and validating signalling systems in accordance with statutory, regulatory, company and client standards. Duties and Responsibilities:- Promote and ensure the appropriate standards of health, […] Read more
SECI Discovers Rs 2.34 Price In 1200 MW Solar Wind Hybrid Auction Updated On Tue, Aug 24th, 2021 by Saurenergy NTPC Limited, NLC India, Mission Ten Renewable Energy (Ayana Renewable Energy), and Azure Energy emerged as the winners in the Solar Energy Corporation of India’s (SECI) auction for 1,200 MW solar-wind hybrid projects (Tranche-IV) related to the Interstate Transmission System (ISTS). The final winning bid was at Rs 2.34/unit. Bids by other majors like ReNew […] Read more
Oman, ACME to Build Green H2 & Ammonia Project Updated On Tue, Aug 24th, 2021 by Saurenergy Oman, the oldest independent state in the Arab world, has signed a land reservation agreement for a green hydrogen and ammonia project that Indian renewable energy company ACME aims to set up in the Special Economic Zone at Duqm. The announcement was made by Oman’s state news agency through Twitter recently. According to its Second […] Read more
MNRE Issues Benchmark Costs for Rooftop Solar PV Systems for FY22 Updated On Fri, Aug 20th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems for the present financial year i.e. 2021-22 (FY22). Benchmark costs for FY22 for general category states/UTs are as follows: Benchmark costs for Special Category States/UTs (i.e. North-Eastern States including Sikkim, Himachal […] Read more
Maharashtra Renewable Plans Back On Track, Powered By Lower Costs Updated On Thu, Aug 19th, 2021 by Saurenergy 2021 has been a good year so far, for renewable energy growth in Maharashtra, with the primary state discom, Maharashtra State Electricity Distribution Company Limited (MSEDCL) finally happy with the bids it received for its recent tenders. With prices dropping to as low as Rs 2.42 for its last solar tender, besides Rs 2.62 for […] Read more
3.5 GW Solar Capacity Added in H1 of 2021 in India, Says Report Updated On Thu, Aug 19th, 2021 by Saurenergy A report by renewable energy research firm JMK Analytics says that India added 3.5 GW of solar capacity in the first six months of the financial year 2022. It places cumulative renewable capacity at 96.95 GW, a figure at variance with government claims of having hit 100 GW. Typically, these differences are accounted for by […] Read more
ENGIE Commissions 200 MW Raghanesda Solar Project Updated On Wed, Aug 18th, 2021 by Saurenergy ENGIE has announced the commissioning of a 200 MWAC (290 MWp) Solar Power Project at the Raghanesda Solar Power Park, in Raghanesda, Gujarat. ENGIE collaborated with multiple Government of Gujarat entities to construct the project that will generate close to 546 gigawatt-hours of electricity. The project was won under a tender process run by GUVNL […] Read more
SJVN Wins Bihar’s 200 MW Solar Project Auction Worth Rs. 1,000 Crore Updated On Mon, Aug 16th, 2021 by Saurenergy A joint venture of Govt. of India & Govt. of Himachal Pradesh, SJVN on Saturday announced winning the auction for 200 MW of Grid-Connected Solar Project of Rs, 1,000 crores in Bihar. According to SJCN’s Chairman Mr. Nand Lal Sharma, SJVN Ltd got the project through Open Competitive Tariff Bidding Process for quoted capacity of […] Read more
CERC Permits SolarArise Subsidiary to get GST Compensation Updated On Sat, Aug 14th, 2021 by Saurenergy The Central Electricity Regulatory Commission (CERC) has ruled in favour of Talettutayi Solar Projects One Pvt. Limited (TSPPL), a subsidiary of Gurugram-based SolarArise, directing Solar Energy Corporation of India Limited (SECI) to pay the solar developer compensation for the increased cost of a project, excluding carrying cost, due to the implementation of the GST laws […] Read more