Electrical Design Engineer DT-Oil filled Updated On Fri, Oct 21st, 2022 by Saurenergy Responsibilities:- The success candidate will be the part of an International Design and Engineering Team heavily specialized in distribution transformer design covering different countries. Responsible for development of transformer designs in coordination with global Hitachi Energy factory based on the purchase order requirement, ordering specification in different areas of transformer Electrical design Coordinating his design […] Read more
MPUVNL Invites RFP for 15 MW of Grid-Connected Rooftop Solar Plant Updated On Fri, Oct 21st, 2022 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has invited a Request for Proposal (RFP) for 15 MW of grid-connected rooftop solar plants. These 15 MW rooftop solar PV systems under the RESCO Model would be installed at various locations in Madhya Pradesh. This MPUVNL 35 MW solar tender includes the scope of work in design, […] Read more
SJVN To Build 105-MW Floating Solar Project In Maharashtra Updated On Fri, Oct 21st, 2022 by Saurenergy State owned renewable energy multinational Satluj Jal Vidyut Nigam (SJVN) has announced that the company has won the 105-MW floating solar project from the Maharashtra State Power Generation Company (MAHAGENCO). SJVN said that it obtained the project through an e-reverse auction. SJVN mentioned in the announcement that it bagged the 105-MW Floating Solar Project at […] Read more
NIWE & NLCIL Collaborate to Build Onshore, Offshore Wind Power Plants Updated On Thu, Oct 20th, 2022 by Saurenergy To collaborate strategically on the development of onshore and offshore wind power projects in India, Neyveli Lignite Corporation Limited India Ltd (NLCIL) and the National Institute of Wind Energy (NIWE)- an independent R&D organization under the Ministry of New and Renewable Energy have signed a Memorandum of Understanding (MoU). The MoU was signed and exchanged […] Read more
GUVNL Invites Bids for 300 MW Wind Power Project Phase IV Updated On Thu, Oct 20th, 2022 by Saurenergy Gujarat Urja Vikas Nigam Ltd. (GUVNL) has floated a tender the phase IV of 300 MW grid-connected for the purchase of power through a competitive bidding process. This project will be a grid-connected wind power project to be set up anywhere in India with an additional 300 MW capacity under the ‘Greenshoe Option’ for compliance […] Read more
ANERT Invites Bids For 2 MW Solar Power Project in Kerala Updated On Thu, Oct 20th, 2022 by Saurenergy The Agency for New and Renewable Energy Research and Technology (ANERT) has floated a tender for the 2 MW solar power projects at the MILMA dairy in Ernakulam, Kerala. The last date to submit the bids is October 29, 2022, and bids will be opened on October 31, 2022. The scope of work of this […] Read more
Asia Brewery Awards 13.8 MWp Rooftop Project to TotalEnergies ENEOS Updated On Wed, Oct 19th, 2022 by Saurenergy Asia Brewery Inc. (ABI), a diversified beverage company based in the Philippines, has given TotalEnergies ENEOS a contract for a 13.8 MWp solar photovoltaic (PV) system power plant on one of its manufacturing plants in the country. About 24% of the facility will be powered by renewable energy thanks to this technique. One of the […] Read more
UAE Gets its First Solar-Powered Car Updated On Wed, Oct 19th, 2022 by Saurenergy Before being on sale formally next year, the world’s first solar car that is ready for production has landed in the United Arab Emirates (UAE). The Lightyear 0 will run on solar energy, and its creators claim that driving it for months at a time without recharging is possible. The Sharjah Research, Technology, and Innovation […] Read more
BHEL Invites Bids for 10 Lakhs Mono PERC Solar Cells Updated On Tue, Oct 18th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for 10 lakhs mono PERC solar cells supply. The tender also includes packing & transportation as per incoterms and satisfactory completion of supply of these cells. According to the tender, the output wattage of each PV cell should be 5.38Wp & has five busbars. Each cell should […] Read more