GSECL Invites Bids For The 20 MW Grid Connected Solar Plant Updated On Fri, Aug 5th, 2022 by Saurenergy Gujarat State Electricity Corporation Limited (GSECL) has floated a tender for the supply of a 20 MW grid-connected solar power plant. This solar plant will be set up at Itiya of Bhavnagar District around the substation of GETCO, Gujarat. The last date for submitting the bid for this solar power project is September 03, 2022, […] Read more
Mechanical Design Engineer – Windchill Updated On Fri, Aug 5th, 2022 by Saurenergy Responsibilities:- Provide CAD data modeling service to GPS of the various products to create and maintain their Product Data in a way that it can be used to build respective product configurator. Support GPS in the migration of legacy CAD data into Creo as standard within PGHV for mechanical design and required data format for […] Read more
New Material Pushes Sodium-Ion Batteries To Phase Out Costly Lithium Updated On Fri, Aug 5th, 2022 by Saurenergy The researchers from Skoltech and Lomonosov Moscow State University have developed a material for sodium-ion batteries which offer an alternative to the increasingly expensive lithium-ion tech. In an official statement, the University said that the new material is a powder of sodium-vanadium phosphate fluoride with a particular crystal structure. It’s used in the battery cathode […] Read more
Adani Green Earnings Call Q1 FY23: Operational Capacity Growth Up To 5800 MW Updated On Thu, Aug 4th, 2022 by Saurenergy Kev revelations were made during the Q1 FY23 earnings call of the green arm of Adani Enterprises, Adani Green Energy Limited (AGEL). Here is a look at them- Capacity Growth On An Upward Trend The operational capacity growth on YoY basis has shot up by 65% to 5800 MW. This growth has been attributed to […] Read more
MSEDCL Invites Expression Of Interest For 298 MW Solar Power Supply Updated On Thu, Aug 4th, 2022 by Saurenergy Maharashtra State Electricity Distribution Company Limited (MSEDCL) has invited an Expression of Interest (EoI) for the procurement of a cumulative 298 MW of solar power from de-centralised solar projects. All these solar projects should be a minimum capacity of 0.5 MW and a maximum capacity of 2 MW under component-A of the PM-KUSUM scheme to […] Read more
Project Electrical Engineer – ACS & REN Projects Updated On Thu, Aug 4th, 2022 by Saurenergy The candidate shall execute with association of work-groups, where applicable, in order to meet assigned objectives. In this role you will work within defined parameters to make decisions, apply concepts to issues of moderate complexity, and resolve issues through immediate action or short-term planning. The current role is expected to deliver ITO/OTR projects on ACS […] Read more
Central Electronics Invites Bids For 15 Lakh Multi-Crystalline Solar Cells Updated On Thu, Aug 4th, 2022 by Saurenergy Central Electronics Ltd (CEL) has floated a tender for the supply of 15 Lakh Multi-Crystalline solar cells. According to the tender, the output wattage of each PV cell should be 4.63Wp per cell or higher & each cell also has five busbars in length. Each cell should be 156.75 x 156.75 mm +/-0.25 mm or […] Read more
Design/Senior Design Engineer – Instrumentation / Electrical Updated On Wed, Aug 3rd, 2022 by Saurenergy Job description / Mission:- Your main task will be to manage the project and steer the project team in order to deliver project in time, within the budget and according to the Customer Specification. The main responsibilities for the Project engineer are:- Collect and interpret information and translate this information into design specification for project […] Read more
Tata Power Green Commissions 225 MW Project in Rajasthan Updated On Wed, Aug 3rd, 2022 by Saurenergy Tata Power Green Energy Limited (TPGEL), a wholly-owned subsidiary of Tata Power, has commissioned a 225MW Hybrid power project in Rajasthan. under a Power Purchase Agreement (PPA). The hybrid solar project’s generating power will be supplied to Tata Power, Mumbai Power Distribution. This PPA will be valid for 25 years in order to fulfill its […] Read more