Pennar Industries Wins EPC Contract For NTPC’s 500 MW Project At Bhadla Updated On Fri, Oct 14th, 2022 by Saurenergy Pennar Industries Limited (PIL) has informed us that it has won the EPC contract against its bid for a major solar project at Bhadla, Rajasthan. The project by NTPC Renewable Energy Limited (NTPC REL) is its proposed 500 MW AC / 625 MW DC Solar PV project at Bhadla, Rajasthan. PIL has emerged as the […] Read more
Madhya Pradesh Eyes 50000 Cr Investment for RE Segment by 2027 Updated On Fri, Oct 14th, 2022 by Saurenergy Recently, Madhya Pradesh Government published the new renewable energy policy titled “Madhya Pradesh Renewable Energy Policy – 2022.” Madhya Pradesh government indicates investing Rs 15,000 crore and Rs 50000 crore for RE (renewable energy) generation industry. The state government plans to build four thousand (4,000) MW of renewable energy projects in the open access solar […] Read more
Associate Director – Hydrogen Updated On Thu, Oct 13th, 2022 by Saurenergy Job Description 1) Project Delivery:- Anchor and lead all Hydorgen assignments for ICF in South Asia Lead client relationship and be the face of ICF in hydrogen domain•Carry out deep analytical work and deliver outstanding output to Clients 2) Team management:- Work with analysts and associates to deliver projects to high degree of client satisfaction•Mentor […] Read more
TPCDOL Invites 180 MW Grid-connected Solar Pumps Under KUSUM Yojna – Component C Updated On Thu, Oct 13th, 2022 by Saurenergy A joint venture between Tata Power and Odisha Government, TP Central Odisha Distribution (TPCODL) has floated a 180 MW of tender for 40,000 grid-connected solar pumps under component-C of the Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Yojna. These grid-connected submersible pumps will be under 1, 2, 3, 5, and 7.5 horsepower (HP). […] Read more
New South Wales Govt’s First Auction Underway for 12 GW RE Zones Updated On Wed, Oct 12th, 2022 by Saurenergy The State Government of New South Wales, Australia, has officially kicked off the country’s biggest renewable energy and storage policy, the NSW Electricity Infrastructure Roadmap that paves way for a cheaper, cleaner and more reliable energy future for the state. The state government held that the auctions will take place every six months. Minister for […] Read more
Electro-Mechanical Design Engineer – Power Quality Solutions Updated On Mon, Oct 10th, 2022 by Saurenergy Responsibilities:- Preparation of PQS Plant Layout (Yard Arrangement – Layout & Plan, Electrical HV / EHV Clearance Check) Preparation of Civil Task (Civil input) Drawings (Foundation, Conduit, Trench, and other civil Requirements) Preparation of Civil Conceptual Design Preparation of PQS Control Building Layout (Electrical Cubicles, Thyristors, Pump skid Arrangement) Preparation of Cable Trench & Conduit […] Read more
Delhi-Based Erisha E-Mobility Launches Three EVs with Charging Stations Updated On Mon, Oct 10th, 2022 by Saurenergy New Delhi-based Erisha E-Mobility, part of the Rana Group, has introduced the E-Superior Electric Cargo Loader, E- Supreme Electric Delivery Van, and E- Smart Electric Passenger vehicle in the L5 category, as well as EV charging stations. Erisha E Mobility manufactures, distributes, and exports electric vehicles (EVs) and hydrogen fuel cell buses. The firm has […] Read more
Lead Engineer – Proposal Management Updated On Fri, Oct 7th, 2022 by Saurenergy Your responsibilities:- Preparation of detailed technical Proposal documents for both domestic & global requirements. Application knowledge for various dry filter media application. In-depth knowledge on the filter bags manufacturing. Preparation of standard templates and bill of material of products for the orders. Tender document review & deviations. Knowledge of costing / estimation will be added […] Read more
MSEDCL Invites RFS for 500 MW Wind Solar Hybrid Projects Updated On Fri, Oct 7th, 2022 by Saurenergy Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) has invited RFS (request for selection) for 500 MW of solar wind hybrid project tender on a long-term basis. In this tender, the power will be purchased through a competitive bidding process from this 500 MW intra-state grid-connected hybrid power project. The last date for submitting the online […] Read more