Proposal Engineer – Crushers Updated On Wed, Oct 25th, 2023 by Saurenergy You will be joining the Global Proposal Team in the Mining organization as a part GPLM Team To support the global & regional sales and proposal teams’ technical & commercial proposal requirements with on-time delivery of proposals and clarification responses. Coordinate with internal stack holders like Sales, Engineering, and Procurement and external stack holders like […] Read more
SECI Looks for Developers to Set Up 2000 MW Wind-Solar Hybrid Projects Updated On Wed, Oct 25th, 2023 by Saurenergy SECI, a Miniratna CPSU under the Ministry of New & Renewable Energy, has issued an RfS for the selection of hybrid power developers for setting up of 2000 MW ISTS-connected wind-solar hybrid power projects in India under Tariff-Based Competitive Bidding (SECI Tranche-VII). The tender fee is INR 29500. The tender EMD is INR 1469000. The […] Read more
We are looking at an expansion plan of 1 GW of TOPCon cell line: Surender Pal Singh, Premier Energies Updated On Mon, Oct 23rd, 2023 by Saurenergy Premier Energies has witnessed a remarkable journey of introducing the first solar panel assembly line with a 3 MW/year capacity, to setting up a fully-integrated 3.4 GW solar cell and module line. The firm is also capable of handling upcoming technologies of cells with larger sizes such as M10, M12 and Multi-Busbar cells. Surender Pal […] Read more
Lead Systems Engineer- Systems Studies Updated On Mon, Oct 23rd, 2023 by Saurenergy This role is designed to interpret the customer’s technical enquiry and to design the most cost effective overall solution for an HVDC installation utilizing the PES power electronics solutions, aiming to minimizing the total cost, and to specify the main (high-value) items of bought-out equipment. The successful candidate will be involved in the development and […] Read more
SJVN Invites Bids for 70 MW Solar Power Project in Assam Updated On Fri, Oct 20th, 2023 by Saurenergy Central Public Sector Utility- SJVN has issued a tender for the design, engineering, supply, erection, testing, commissioning of 70 MW (AC) and/or 50 MW (AC) grid connected solar power project in Assam, including three (03) years comprehensive operation and maintenance (O&M) at designated locations of Assam Power Distribution Company Limited (APDCL), Assam. As per the […] Read more
India and US Are Major Drivers Of Utility-Scale Solar Power: ISA Updated On Fri, Oct 20th, 2023 by Saurenergy The International Solar Alliance (ISA) recently released a report titled ‘World Solar Market Report’. It talks about the overall global scenario in the solar energy sector. The report placed India as one of the new undisputed leaders in global solar energy deployment. The report mentions that the global solar PV deployment had been primarily driven […] Read more
SJVN Seeks Developers to Supply & Maintain 18 MW Solar Projects Updated On Thu, Oct 19th, 2023 by Saurenergy SJVN Green Energy Ltd, a wholly owned subsidiary of SJVN has issued a tender to invite bids for the design, engineering, supply, erection, testing, commissioning of grid connected solar power project of cumulative capacity of 18 MW (AC) at four different locations of Bhakra Beas Management Board (BBMB), including three (03) years of comprehensive operation […] Read more
Lead Design Engineer Electrical Updated On Wed, Oct 18th, 2023 by Saurenergy Detail Design of Electrical Distribution Systems for Industrial Plants of various nature like Chemical, Pharma, Tyre, Heavy Engineering Industries, Ware Houses – HV and Low Voltage Electrical Distribution system based on Indian and IEC Standards. Prepare Design Basis, Load list, Cable schedule, Interconnection Schedule, Single Line Diagrams, schematics, Bulk MTO. Perform Equipment sizing calculations e.g. […] Read more
Cabinet Approves Plan For 13 GW Of Renewable Project In Ladakh Updated On Wed, Oct 18th, 2023 by Saurenergy The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, Narendra Modi, today approved the project on Green Energy Corridor (GEC) Phase-II – Inter-State Transmission System (ISTS) for 13 GW Renewable Energy Project in Ladakh. The project is targeted to be set up by FY 2029-30 with total estimated cost of Rs 20,773.70 crore […] Read more