NHPC REL Seeks Developer For 19.2 MW RESCO Project In Haryana Updated On Thu, Feb 20th, 2025 by Saurenergy NHPC, on behalf of its subsidiary NHPC Renewable Energy Limited (NHPC REL), has issued a tender for the construction of a rooftop solar project. NHPC REL will be the rooftop solar developer (RTD) of the RESCO project and will also be the Project Management Consultant (PMC) for the project. NHPC REL has set March 24 […] Read more
CEL Seeks EoI For 40 MWp Automated Solar Manufacturing Plant Updated On Thu, Feb 20th, 2025 by Saurenergy Central Electronics Limited (CEL), has issued an Expression of Interest (EOI) seeking vendors to identify domestic suppliers for outsourcing the Automated Solar PV Module Manufacturing Plant. The plant has an annual capacity of 40 MWp when operated in three shifts and will be located in Sahibabad on an ‘as-is-where-is’ basis. The last date for EoI […] Read more
CERC Adopts tariff For SECI’s 1200 MW Wind Solar Hybrid Projects Updated On Thu, Feb 20th, 2025 by Saurenergy In an order dated February 18, the Central Electricity Regulatory Commission has adopted the proposed tariffs for SECI’s 1200 MW Hybrid projects comprising wind and solar energy under Tranche VIII. SECI had issued the letter of awards to the winning bidders on June 20, 2024. The projects will now await the signing of formal PPAs, […] Read more
Assistant Manager- ELV Design Updated On Wed, Feb 19th, 2025 by Saurenergy Responsibilities:- Familiar with MEP Design, capable of handling the in-house design deliverables for various Residential, Commercial, Mall, Hotel, Data Centre developments etc. Front End Engineering Design (FEED) Project Engineering Development Product Engineering Evaluation Value Engineering Market Rate Assessment Innovative Technological Study Appointment of Consultants Consultancy Payment Certification Consultants’ Additional Fee Claims & Validation Tender Documentation […] Read more
System Design and Study Engineer Updated On Wed, Feb 19th, 2025 by Saurenergy Engineering authority in design studies and performance evaluation studies for projects/tenders for Flexible A.C. Transmission Systems (FACTS) technology aligned with Power Quality Solutions (PQS) Business. Roles and responsibilities: Define topology and single line diagram for FACTS solution based on customer requirement. Specify main circuit components such as Power Transformer, Power Electronics Valves, Reactors, Capacitors, CT, VT, Breaker etc. based […] Read more
Green Stocks Feb 18: Bottom Fishing To Emerge Soon In RE Stocks? Updated On Tue, Feb 18th, 2025 by Saurenergy With no respite for the market in a volatile trade environment, green energy stocks continued to be buffeted by the winds from the US. A lot of what US President Donald Trump has already proven to be hot air, but the sheer impact of the US remains large enough to shake up global markets. India […] Read more
Q3FY25: 10 Major Takeaways From SJVN Investors Call Updated On Tue, Feb 18th, 2025 by Saurenergy SJVN Limited, an Indian Public Sector Enterprise, which was earlier confined to hydroelectric power has now diversified its energy portfolio. The company is now foraying into several new renewable energy projects ranging from floating solar, vanilla solar and other projects. In its latest investors call, the company talked about its performance, challenges and current pace […] Read more
NHPC Call For Bids For 1.2 GW Solar Park Project At UP Updated On Mon, Feb 17th, 2025 by Saurenergy NHPC on behalf of Bundelkhand Saur Urja Limited (A Joint Venture of NHPC Ltd. and Uttar Pradesh New and Renewable Energy Development Agency i.e. UPNEDA) issued a tender, to build a solar park project. It includes the construction of security buildings and civil Works of a solar power park to develop a 1.2 GW Solar […] Read more
Waaree RTL Gets 40 MWh BESS Order From Continuum Green Energy Updated On Fri, Feb 14th, 2025 by Saurenergy Waaree Renewable Technology (Warree RTL) has secured a Letter of Award (LOA) for an EPC work order for a 40 MWh battery storage system from Continuum Green Energy Limited. The company disclosed the project order size in a regulatory filing, which said, “The project order size is approximately INR 40 Cr.” Additionally, the company mentioned, […] Read more