Engineer – Project Development and Analytics Updated On Wed, Aug 28th, 2024 by Saurenergy In this role, you will be directly reporting to Head of Section- Project Development & Analytics. Project Development team is actively involved in pre-construction phase of a wind farm, performing wind resource and energy assessments, and site condition assessments at various phase of the project lifecycle. Broad Expectations:- Fully aligned with the characteristics of the […] Read more
Extended Wait Ahead For Any Price Drops In Solar, Wind Updated On Wed, Aug 28th, 2024 by Saurenergy If you track India’s renewable sector, you couldn’t have failed to notice the seeming exuberance in recent months. Amplified by the soaring valuations of listed firms on the country’s stock exchanges, at SaurEnergy, we have tracked how a basket of ‘green energy’ stocks we track has grown over 120% in value over a year. This […] Read more
A Week Later, No Relenting In Tamil Nadu Decision To Add ‘Resource Charge’ On Wind Energy Updated On Tue, Aug 27th, 2024 by Saurenergy The Tamil Nadu government , which imposed a Rs 50 lakh ‘resource charge’ for every MW of upcoming ISTS connected wind energy installations in the state, seems unwilling to relent on the decision. The state, one of the most well placed to generate wind power in the country with an installed capacity of 10.7 GW, […] Read more
Civil Design Engineer – Power Quality Solutions Updated On Mon, Aug 26th, 2024 by Saurenergy In this role, you will be responsible for:- GIS Building super structure, Office/Storage buildings super structure. Structural analysis and design of conventional reinforced concrete structures & steel structures HV / EHV Substation Switchyard equipment foundations which include Power transformers, Reactors, Switchgear, Gantry and Towers along with drainage and cable trenches. GIS Building foundations, Office/Storage buildings […] Read more
Khavda Project: GIPCL Issues Bids For Supply Of 500 MW Bifacial Modules Updated On Mon, Aug 26th, 2024 by Saurenergy The Gujarat Industries Power Company Limited (GIPCL) has now issued a tender to supply solar modules for a 500 MW (AC) / 625 MWp solar PV project at the Great Rann of Kutch near Khavda in Gujarat with September 3rd set as the last date of pre-bid queries/ clarifications. GIPCL invited bids to select contractors […] Read more
SECI Seeks 800 Acres Of Land For 200 MW Solar Project In MP Updated On Fri, Aug 23rd, 2024 by Saurenergy Solar Energy Corporation of India (SECI) recently released a tender for the selection of an agency for the outright purchase or lease of 800 acres of land for the development of a 200 MW solar project in Madhya Pradesh with September 23 as the last date for bids submission. The SECI tender states that for […] Read more
Business Development Manager- Oil and Gas Updated On Fri, Aug 23rd, 2024 by Saurenergy Great opportunity to join a highly entrepreneurial Business Development role in an existing hypergrowth venture in Green Hydrogen & Derivatives Space. Further details are to be revealed in 1-1 discussion. Please do not apply if you do not meet the mandatory requirements below. Develop and deploy scaled-up commercially attractive Green Hydrogen and Green Ammonia production […] Read more
NTPC Awards JSW Neo 300 MW Of Hybrid Power Projects Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), a subsidiary of JSW Energy Limited, received a Letter of Award (LoA) for a 300 MW ISTS-connected Wind-Solar Hybrid Power Project from NTPC Limited. JSW Neo Energy got this project against a tariff-based competitive bid and was invited to set up 1,000 MW ISTS-connected Wind-Solar Hybrid Power Projects (NTPC-Tranche-VI). […] Read more
Draft Norms: MoP Proposes Timeline Of 66 Months For PSPs Updated On Fri, Aug 23rd, 2024 by Saurenergy The Ministry of Power (MoP) has now issued draft guidelines for the issuance of tenders related to Pumped Storage Projects (PSPs). The new proposed norms mandate that the on-river PSPs need to commence its operations after 66 months after the signing of the Power Purchase Agreement (PPA). For the off-river projects, the developers need to […] Read more