RACEnergy, Hala Mobility Join Hands For Deployment Of Battery Swapping Technology Updated On Tue, Apr 18th, 2023 by Saurenergy Hyderabad-based battery swapping technology player RACEnergy has collaborated with multi-modal ride-sharing platform Hala Mobility for the deployment of battery swapping technology for 2,000 electric two-wheelers. The partnership is aimed at facilitating smooth run of electric mobility. The battery swapping technology of RACEnergy will be integrated with electric scooters. These EVs will be employed for delivery […] Read more
Powerica Ltd Entitled To Compensation Due To Rise of GST Rates Post-Contract, Rules CERC Updated On Tue, Apr 11th, 2023 by Saurenergy The Central Electricity Regulatory Commission (CERC), in its latest Order, while hearing a petition filed by Powerica Limited, has ruled that the change of Goods and Service Tax (GST) rates after receiving a contract was a deemed case of ‘change of law.’ Accordingly, the regulatory body also ordered compensation to the wind energy company on […] Read more
We offer strong after sales service and spare support: Sachidanand Upadhyay, Lord’s Mark Updated On Thu, Apr 6th, 2023 by Saurenergy Incorporated in 1998, Lord’s Mark Industries Private Ltd. (Lord’s) started manufacturing computer continuous stationary and copier paper and gradually diversified to other segments viz; LED products, solar power solutions & solar appliances, lithium batteries, electric scooters, and charging stations. With the launch of its subsidiary, Lord’s Automative Private Limited, the firm ventured into the green mobility […] Read more
Sunpure Robots to Clean Sprng Energy Solar Projects in India Updated On Thu, Mar 30th, 2023 by Saurenergy Technological manifestation is on the rise in the renewable energy sector which propels the green energy scenario in India. In a key development, Sunpure Technology Co. Ltd. has announced that it has signed agreements with renewable energy developer Sprng Energy, under which, Sunpure will supply its robotic cleaning systems that do not require water in […] Read more
2W EV Firm BikeWo Launches BikeWo Shield with Five-Year Warranty Updated On Tue, Mar 21st, 2023 by Saurenergy Hyderabad-headquartered BikeWo, a multi-brand two-wheeler Electric Vehicle (EV) firm has launched ‘BikeWo Shield’. The shield promises a five years’ warranty, which the firm hopes will increase the adoption of EV by instilling confidence in customers with regards to safety and reliability of EVs. BikeWo maintains that the scheme stands out from other such existing ones […] Read more
Osmania University Mulls 1 MW Solar Power at Campus Updated On Tue, Feb 21st, 2023 by Saurenergy The renewable energy in Telangana continues to have a solid run. In a new development, the Osmania University (OU) is mulling to set up a solar power plant in its campus that will allow it to meet the power requirements. According to reports, the Osmania University will install solar power panels that will produce about […] Read more
As More States Define EV Policies, Consistency and Relevance Key To Impact-Climate Trends Updated On Fri, Feb 17th, 2023 by Saurenergy Enabling policies both at national and state level have made the environment conducive for e-mobility in India. The figures speak for themselves. Of the 36 states and Union Territories in the country, 26 have released EV policies over the last 5 years, with 16 of them being released between 2020 and 2022. A study by […] Read more
Fraunhofer ISE to be Technology Partner for Emmvee’s New Solar Cell Factory in Bengaluru Updated On Tue, Feb 14th, 2023 by Saurenergy PV modules maker and supplier Emmvee Group has announced that it has signed an MoU with Fraunhofer ISE which is the largest solar research institute in Europe. The MoU appoints Fraunhofer ISE as the solar technology partner of Emmvee for its upcoming solar cell manufacturing facility near Bengaluru. The official statement Emmvee held that the […] Read more
CERC Grants Extension of Time for Drawal of Start-Up Power to NTPC Updated On Mon, Feb 13th, 2023 by Saurenergy The CERC has given its green signal to a petition filed by NTPC seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid beyond the period of fifteen months (after 15.2.2023). NTPC shared that the Telangana (steam-based thermal power station) STPS consists of two units […] Read more