ReneSola Power Announces Closing of Sale of 4.3 MW Solar Projects in the UK Updated On Wed, Nov 25th, 2020 by Saurenergy ReneSola Ltd (NYSE: SOL) (“ReneSola Power” or the “Company”), a leading fully-integrated solar project developer, today announced the closing of the sale of a portfolio of operating projects located in the United Kingdom to Atmosclear Investments Ltd, an European renewable energy and cleantech private equity group. The portfolio comprises 1,509 residential rooftop projects located in Scotland, with a combined […] Read more
Dubai’s 5GW Solar Park On Track With 3rd Phase Opening Updated On Wed, Nov 25th, 2020 by Saurenergy The Dubai Water and Electricity Authority (DEWA) has formally announced the official opening of the 800 MW third phase of the Mohammed bin Rashid Al Maktoum Solar Park (MBRAM). Named after the UAE’s Prime Minister and Vice President, Sheik Mohammed bin Rashid Al Maktoum himself came to do the honours. With the latest opening, the park’s […] Read more
With Fresh Price Lows In Auctions, Are Solar Projects Awaiting PSA’s Truly Safe? Updated On Tue, Nov 24th, 2020 by Saurenergy In the last month and more, there have been multiple reports about the failure of the Solar Energy Corporation of India (SECI), a key nodal body that has been conducting utility scale solar auctions to sign PPA’s (Power purchase Agreement) with winning developers. SECI in turn blames it on the delay on the part of […] Read more
Trina Solar Purchases 1.2 Billion units of 210mm Monocrystal Silicon Wafers in Cooperation with Zhonghuan Updated On Mon, Nov 23rd, 2020 by Saurenergy Changzhou Trina Solar Energy Co., Ltd. (hereinafter Trina Solar) and Tianjin Zhonghuan Semiconductor Co., Ltd., (hereinafter Zhonghuan) signed a framework contract. Under the contract, Trina Solar intends to purchase 210mm monocrystal silicon wafers from Tianjin Huanou International Silicon Material Co., Ltd., a subsidiary of Zhonghuan. During the proposed procurement period between January 2021 and December 2021, the estimated total contract value […] Read more
Karnataka Will Look to Collaborate With the UK on RE Front: Yediyurappa Updated On Mon, Nov 23rd, 2020 by Saurenergy Karnataka CM BS Yediyurappa has said that the state will be very interested in engaging with the UK on renewable energy (RE) technology front. Karnataka Chief Minister BS Yediyurappa has said that the state will be very interested in engaging with the United Kingdom (UK) on the renewable energy (RE) technology and implementation front. During […] Read more
India’s RE Capacity to Reach 160 GW by 2025, Investment of Rs 4 Lakh Cr: ICRA Updated On Fri, Nov 20th, 2020 by Saurenergy ICRA expects a gradual shift in RE technology bidding in India to shift towards hybrid projects, and that RE capacity will reach about 160 GW by March 2025 In its latest market analysis credit and rating agency, ICRA has said that it expects to witness a gradual shift in renewable energy (RE) technology bidding in […] Read more
Total to Operate 2300 EV Charge Points of Bélib’ Network in Paris Updated On Thu, Nov 19th, 2020 by Saurenergy Total has won the City of Paris’ concession tender for the modernisation and extension of its public EV charge points network, installed throughout Paris. Total has announced that it has won the City of Paris’ concession tender for the modernisation and extension of its public Electric Vehicles (EV) charge points network, installed throughout the French […] Read more
Tender For 100 MW Floating Solar Hybrid On Mumbai’s Middle Vaitarna Dam Updated On Wed, Nov 18th, 2020 by Saurenergy Mumbai’s Middle Vaitarna dam, whose reservoir is is one of the seven key lakes that supply drinking water to the city, could soon be supplying power too, to the city. The Municipal corporation of Greater Mumbai has floated a tender for the establishment of a Hybrid floating solar PV plant on the lake, of 100MW […] Read more
MNRE’s October 2020 Report Card For Cabinet Updated On Tue, Nov 17th, 2020 by Saurenergy In its’s monthly report for the union Cabinet, the R.K Singh led MNRE has highlighted key monthly achievements for October this year. While the success with minimising Covid impact has been set off by the lingering issues on other fronts that have caused a slowdown in fresh capacity installation, the MNRE does have a potential […] Read more