Drafting Engineer Updated On Fri, Jan 3rd, 2025 by Saurenergy Responsibilities:- Create accurate, detailed technical plans for electrical systems using computer-aided design programs to convert specifications and design information from engineers into schematics and blueprints. Design, Optimize and create Site layouts based on local governing laws and construction guidelines for various countries in APAC region. Collect, study and combine rough sketches and initial design ideas […] Read more
Green Stocks Jan 3: As Market Gives Up Gains, Green Stocks Struggle As Well Updated On Fri, Jan 3rd, 2025 by Saurenergy After yesterday’s strong show, it was time for a dose of reality, as the Nifty gave up some of its gains today. For Green Energy stocks as well, it was a similar story, with KPI Green correcting over 3%, with only Shakti Pumps (up over 4%) and Acme Solar clocking any notable gains. For others, […] Read more
SECI Awards 200 MW FDRE Project To Altra Xergi At Rs. 8.50/kWh Updated On Fri, Jan 3rd, 2025 by Saurenergy Altra Xergi Power, an O2 Power subsidiary, recently secured a 200 MW project from Solar Energy Corporation of India (SECI). The company secured this project out of the initial 8,000 MWh (2000 MW x 4 hours) renewable energy tender. The Altra Xergi secured the project from SECI at the quoted tariff of Rs. 8.50/kWh to […] Read more
SECI Issues Tender For 10 MW Floating Solar Project In Telangana Updated On Fri, Jan 3rd, 2025 by Saurenergy The Solar Energy Corporation of India (SECI) recently released a tender to build a 10 MW Floating Solar Project (FSPV) at Singareni Thermal Power Project (STPP), Telangana. Bidders are expected to submit their bids by January 23, 2025. Singareni Collieries Company Limited (SCCL) is a government coal mining company jointly owned by the Government of […] Read more
SECI Proposes, CERC Disposes- JSW Energy’s 500 MW BESS Tender In Trouble Updated On Fri, Jan 3rd, 2025 by Saurenergy In a blow to JSW Energy’s BESS plans, the tender it won for SECI’s 500 MW/1000 MWh standalone battery energy storage systems has failed to pass muster with CERC. On plea to adopt the tariffs for the said tender, won by JSW Energy at Rs 10.88/unit after due process, the CERC pointed to the inexplicably […] Read more
Manager- Materials Quality – Mechanical Updated On Thu, Jan 2nd, 2025 by Saurenergy ACCOUNTABILITIES:- Review & approval of supplier documents, MQP, Type tests , inspection reports of Steel Coils, Module mounting structures, Transmission Tower structures, various Conductors for Transmission, Construction steel, Robotic cleaning systems etc . Inspection and testing of above items by self and through TPIAs. Conducting, co ordinating and planning supplier/factory audits, product inspections and Proto […] Read more
Assistant Manager – Carbon Business Updated On Thu, Jan 2nd, 2025 by Saurenergy Conversant with carbon development process, especially with renewable energy, clean cookstoves, biodigesters, landfill methane capture, plastic recycling, clean water and similar project’s emission reduction computations, GHG accounting, familiarity with various framework of Verra, Gold Standard, GCC and other registry’s methodologies, standards, tools (Including that of CDM’s). You are expected to write PDDs, have fair understanding […] Read more
Sahaj Solar Bags Rs.36.42cr Agri Solarization Order In Tripura Updated On Thu, Jan 2nd, 2025 by Saurenergy Gujarat-based Sahaj Solar recently secured a Letter of Award (LoA) from the Tripura Renewable Energy Development Agency (TREDA) for the solarization of existing 2 HP grid-connected agricultural pumps (IPS). The company stated in a regulatory filing, “These pumps include a 5-year guarantee/warranty and an annual maintenance contract, including insurance coverage, on a turnkey basis in […] Read more
Ladakh To Start Livestock-Grazing Solar Project On Pilot Basis Updated On Thu, Jan 2nd, 2025 by Saurenergy In a recent meeting aimed at building local stakeholders’ confidence in the upcoming mega solar power project at Pang, government officials decided to formalize an action plan to create a pilot solar project in the Pang area of Ladakh. The meeting was held under the chairmanship of Vikram Singh Malik, IAS, Administrative Secretary of the […] Read more