Ramakrishna Forgings Invests Rs.12.90 Cr In Green Energy Deal With AMP Energy Updated On Mon, Oct 28th, 2024 by Saurenergy Ramakrishna Forgings, a metal forming company, recently made an investment of Rs. 12.90 crore in the form of equity and debentures in AMP Energy C&I Fifteen. The Kolkata-based company entered into Share Subscription and Shareholders Agreements, along with other relevant agreements, with the AMP Energy subsidiary for the procurement of solar power under a captive […] Read more
NTPC Plans To Develop 300 MW Solar Project, Issues Tender Updated On Mon, Oct 28th, 2024 by Saurenergy NTPC recently released a tender to develop a 300 MW ground-mounted solar project and terminal bay near the NTPC Anta substation. It is accepting bids until 5th December 2024. The bidder will be responsible for arranging the land for the solar project and for the design, engineering, manufacturing, transportation, storage, installation, and commissioning of the […] Read more
Gensol Reports 29% Rise in Profits In Q2 Over Last Year Updated On Mon, Oct 28th, 2024 by Saurenergy Gensol Engineering Limited a prominent player in the renewable energy sector specializing in solar engineering, procurement, and construction (EPC) services, along with electric mobility solutions, announced its unaudited consolidated and standalone financial results for the second quarter and half year ended September 30th, 2024 (Q2 & H1 FY25). With a play across solar projects, O&M, […] Read more
Assistant Manager – Supplier Quality (Electrical) Updated On Fri, Oct 25th, 2024 by Saurenergy Ensure timely completion of TER products. Responsible for reviewing supplier documents such as TTR (Type Test Reports) and packaging methods, etc. Responsible for review and approval of MQP (Manufacturing Quality Plan). Responsible for monitoring the quality of inspections. Ensure receipt of TPIA inspection reports, review reports, and provide technical clearance within TAT timelines. Ensure timely […] Read more
Senior Site Engineer -Solar Updated On Fri, Oct 25th, 2024 by Saurenergy Role & responsibilities:- Site Administrations as per corporate Guidelines / Follow ups with local authorities Viz: EB, Other Admin bodies. Benchmarking and Analysis of PIs such as Generation, losses, auxiliary power consumption, equipment availability, PR etc to maximize plant efficiency. Follow Up with Customer on JMR and Receivables. Monitoring and verifying proper Project Handover and […] Read more
Go Solar, Growatt Team Up To Distribute 1 GW Inverters Across Australia Updated On Fri, Oct 25th, 2024 by Saurenergy Growatt Australia, a residential and commercial solar energy solutions provider, and Go Solar Group have signed a Memorandum of Understanding (MOU) during the 2024 All Energy Expo. The MoU was signed by Allen Zhu, Growatt Australia’s Country Manager, and Lewis Sheppard, National Sales Director of Go Solar Group. Under the terms of the agreement, Go […] Read more
SOFAR Flaunts Solar Solutions At All Energy Australia 2024 Updated On Fri, Oct 25th, 2024 by Saurenergy The latest All Energy Australia (AEA) exhibition opened at the Melbourne Convention and Exhibition Centre attracted industry experts and participants from across the global renewable energy sector. The two-day event is bustling with activity, showcasing the latest innovations and developments in clean energy. SOFAR unveiled its solar and energy storage solutions. Australia’s Solar and Energy […] Read more
Ladakh: NTPC, Indian Army Set To Build Solar Hydrogen Microgrid Project Updated On Fri, Oct 25th, 2024 by Saurenergy NTPC has partnered with the Indian Army to establish a Solar Hydrogen-based Microgrid at Chushul, Ladakh. This would provide a stable power supply using Green Hydrogen in off-grid Army locations. The Defence Minister Rajnath Singh laid the foundation stone of this unique project through video conferencing. NTPC has designed this solar hydrogen-based microgrid system to […] Read more
CERC Amends Indian Electricity Grid Code Rules Updated On Fri, Oct 25th, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) recently issued amendments to the Indian Electricity Grid Code, originally released in 2023. These adjustments address various aspects of grid operation, including timeframes for power injection, scheduling of generation, compensation mechanisms, and revisions in scheduling flexibility. One amendment specifies limits on the injection of infirm power, or power generated […] Read more