Delhi’s Grid Flexibility To Cut Peak Demand By 4 GW: RMI Updated On Wed, Aug 14th, 2024 by Saurenergy RMI’s recent report highlighted changes in Delhi’s power grid system, which has utilized grid flexibility technologies to manage and mitigate increasing demand peaks in the city. RMI estimates suggest that by 2030, Delhi could reduce 250–1,350 megawatts (MW) of peak demand through air conditioning (AC) demand response (DR) programs. It is estimated that grid flexibility […] Read more
Sungrow Delivers First BESS PowerTitan 2.0 Units in Europe Updated On Wed, Aug 14th, 2024 by Saurenergy Global energy storage solutions company Sungrow announced the first delivery of the cutting-edge Battery Energy Storage System (BESS), the PowerTitan 2.0 units in Europe. A total of 66 units have arrived in the UK, marking a new beginning in the Bramley 100MW / 330MWh project by Penso Power and BW ESS. The delivery comes less […] Read more
India May Add 30 GW Of Renewable Capacities In 2024-25 Updated On Wed, Aug 14th, 2024 by Saurenergy India seems to be racing towards achieving a record-breaking renewable capacity addition number in 2024-25. The rise in pace of solar and wind energy installations in the first seven months of calendar year 2024 indicates every probability of record capacity additions. This will follow a strong show in 2023, when 18.5 GW of renewable energy […] Read more
Waaree Energies Secures 90 MW Contract From Juniper Green Updated On Tue, Aug 13th, 2024 by Saurenergy Indian solar module manufacturers Waaree Energies has now secured a 90 MW order to supply of 540/545Wp dual glass bifacial modules to Juniper Green for their solar project in Bikaner, Rajasthan. Sunil Rathi, Director Sales, Waaree Energies said, “We are glad to have won this order of Juniper for this project represents a significant stride […] Read more
Gensol Q1 Results- Revenues Up 105% at ₹297crores, Order Book At ₹5,025 Crore Updated On Tue, Aug 13th, 2024 by Saurenergy Gensol Engineering Limited, a prominent player in the renewable energy sector specializing in solar engineering, procurement, and construction (EPC) services, along with electric mobility solutions (BluSmart), today announced its consolidated and standalone financial results for the quarter ended June 30th, 2024 (Q1 FY25). Q1 FY25 Highlights: Total Revenue was ₹297 Crore for Q1 FY25 compared to ₹145 Crore in Q1 […] Read more
Avaada Signs MoU To Develop 2750 MW Of PSPs In Maharashtra Updated On Mon, Aug 12th, 2024 by Saurenergy Indian renewable project developer Avaada Group has now announced signing of a Memorandum of Understanding (MoU) with the Maharashtra government for the development of two Pumped Storage Projects (PSPs) with a combined capacity of 2,750 MW. This comes at a time when several leading companies in India like Adani Green, Greenko and others are showing […] Read more
Extreme Temperatures: CEA Issues Clarifications To Wind Companies Updated On Mon, Aug 12th, 2024 by Saurenergy The Central Electricity Authority (CEA) has issued clarifications for the wind power companies related to their compliance with the norms related to extreme temperatures. This clarification came to the forth after the Wind Power Producers Association (WIPPA) approached the Ministry of Power. The association had earlier apprised the ministry about the hurdles in obtaining Connectivity […] Read more
CRISIL Predicts Lower Thermal Share In Generation Next Fiscal Updated On Mon, Aug 12th, 2024 by Saurenergy CRISIL Ratings, in a sectoral report has predicted a drop of over 500 bps (basis points) in share of thermal plants in India’s power generation by next fiscal. The prediction is based on expectations of stronger addition of renewable energy (RE) capacities of as much as 50 GW over the next two years. These are expected […] Read more
Envision bags 116 MW Wind Turbine Deal From Blueleaf Energy Updated On Mon, Aug 12th, 2024 by Saurenergy Envision Wind Power Technologies India Private Limited has announced a major milestone by securing a 116 MW turbine supply agreement with Blueleaf Energy. This agreement involves the supply of 35 EN-156 3.3 MW turbines for a co-located wind-solar hybrid power project in Madhya Pradesh, set to commence construction in 2024 and complete by 2025. […] Read more