TPREL Delivers 200 MW Solar Project In Bikaner To Power Trading Arm Updated On Mon, Apr 1st, 2024 by Saurenergy TP Saurya Limited (TPSL), a subsidiary of Tata Power Renewable Energy Limited, has confirmed the successful commissioning of a 200MW solar project located in Bikaner, Rajasthan, for Tata Power Trading Company Limited (TPTCL). The 25 year PPA for the project had been signed in May 2023, with a targeted delivery date of March 2024. Expected […] Read more
Roofsol Energy Receives 10.5 MWp Solar Project From Shree Cement Updated On Mon, Apr 1st, 2024 by Saurenergy Mumbai-based EPC company Roofsol Energy Pvt Ltd has been awarded a solar project by Shree Cement Limited of 10.5 MWp capacity. The ground-mounted “Behind the Meter” project is to be implemented in Uttarakhand and Jharkhand. The company mentioned about its project stating, “Shree Cement owns and operates cement grinding units in 9 locations across India […] Read more
COVER STORY: India Gears Up For Solar Waste Recycling Challenge Updated On Mon, Apr 1st, 2024 by Saurenergy The latest report from the Central Electricity Authority (CEA) states that India’s total solar energy capacity crossed 75 Gigawatts (GW) by the end of February this year. According to its own estimates, the country will need 292 GW of total solar capacity by 2030. With the steady additions of solar power to the Indian grid, […] Read more
Torrent Power Secures 450 MW Wind-Solar Hybrid Project Updated On Mon, Apr 1st, 2024 by Saurenergy Torrent Power, a Gujarat power company has announced it has secured 300 MW power from wind-solar hybrid energy projects, with a greenshoe option of up to 150 MW through an auction. Further, the company also stated that it won the auction after quoting Rs 3.65/kWh The tender for 300 MW of power supply, with a […] Read more
Adani Green Operationalises 1 GW Of Solar Projects At Khavda Within 24 Hours Updated On Fri, Mar 29th, 2024 by Saurenergy In two back to back filings at the Bombay Stock Exchange (BSE), Adani Green Energy Limited has announced the operationalisation of two traches of solar projects at Khavda Gujarat. While one involved a group of projects adding upto 775 MW, the other filing pertained to a further 212 MW of projects operationalised. The announcements follow […] Read more
ALMM To Rule Solar From April 1, 2024 in India Updated On Fri, Mar 29th, 2024 by Saurenergy Putting to rest any doubts over the future of sourcing for key solar projects, the Ministry of New and Renewable Energy (MNRE) has confirmed the deadline of March 31 for ending all ALMM related exemptions for developers in a terse, one page office memorandum. At SaurEnergy, we had predicted this outcome early this week. That […] Read more
Luminous Moves Forward On Solar Panel Mfg. With 250 MW Panel Plant Updated On Thu, Mar 28th, 2024 by Saurenergy Read more
Luminous Moves Forward On Solar Panel Mfg. With 250 MW Panel Plant Updated On Thu, Mar 28th, 2024 by Saurenergy Leading energy solutions firm Luminous Power Technologies inaugurated its Solar Panel Factory in Rudrapur, Uttarakhand. The company claims the facility has cutting-edge technology and infrastructure designed to ensure maximum efficiency and minimal environmental impact. The launch was graced by legendary cricketer and Luminous Brand Ambassador Sachin Tendulkar, accompanied by Preeti Bajaj, CEO & MD, Luminous Power Technologies, and Manish […] Read more
Leeward Renewable Energy Secures 400 MW Solar Projects From Microsoft In Texas Updated On Thu, Mar 28th, 2024 by Saurenergy US-based renewable energy company, Leeward Renewable Energy has announced that it has entered into two 200-megawatt (MW) Power Purchase Agreements (PPA) with Microsoft Corp. Through these PPAs, Microsoft will purchase the power generated from two 200-MW LRE solar facilities currently under development at Morrow Lake Solar in Frio County, Texas, and Cradle Solar in Brazoria […] Read more