5 Challenges That Can Increase Solar Module Costs In India Updated On Mon, Nov 25th, 2024 by Saurenergy The Indian solar module manufacturing sector, once heavily reliant on Chinese imports for solar modules and cells, is gradually moving toward self-reliance. However, this transition brings its own set of hurdles, which could lead to increased costs for solar panels and project development, potentially pushing solar tariffs higher in the coming years. 1. Reduced Export […] Read more
SaurEnergy Explains- The Solar Tender At the Centre of Adani’s US Controversy Updated On Mon, Nov 25th, 2024 by Saurenergy Read more
News In Brief Nov 25: Sungrow Partners with Zenith Energy, HG Infra Secures BESS Contract, Ecoprogetti Delivers Solar Panels To SAEL Updated On Mon, Nov 25th, 2024 by Saurenergy Sungrow Partners with Zenith Energy to Power Australia’s Largest Off-Grid Hybrid Project Sungrow, a PV inverter and energy storage system provider, recently developed Australia’s off-grid hybrid renewable energy system in the Kathleen Valley Operation. Developed in collaboration with Zenith Energy and Liontown Resources, this initiative sets a new precedent for integrating renewable energy solutions in […] Read more
ReNew Foresees A Dip In Solar Cell Capacity With ALCM Updated On Mon, Nov 25th, 2024 by Saurenergy NASDAQ-listed solar module manufacturer ReNew expects a significant shortfall in cell capacity in India with the imposition of the proposed Approved List of Cell Manufacturers (ALCM). The company in its latest investors presentation anticipated a transition in the Indian solar cell market with the introduction of ALCM. The company said that the proposed decision of […] Read more
MPUVNL Invites Bids For 26 MW Rooftop Solar Project Updated On Mon, Nov 25th, 2024 by Saurenergy The Madhya Pradesh Corporation (MPUVNL) recently floated a tender to build on-grid and off-grid solar rooftop systems with a total 26 MW capacity. The last date for bid submission is December 31, 2024. The recent tender plans to develop solar projects in Madhya Pradesh (MP) and to bring standardization of rates and selection of contractors […] Read more
SaurEnergy Explains- The Solar Tender At the Centre of Adani’s US Controversy Updated On Mon, Nov 25th, 2024 by Saurenergy By now, a lot has been written about the charges brought at a US district court against key names in the Adani group, besides Azure power. While those charges will be contested no doubt by the firms as already announced, it is a good time to understand just what tender it was where allegations of […] Read more
Senior Engineer- Solar Asset Management Updated On Fri, Nov 22nd, 2024 by Saurenergy Should have sound knowledge on basic principles of Electrical Components. Preparation of various documents as per ISO standards. Experience in problem solving by using tools like Root Cause Analysis, Corrective Action & Preventive Action process. Raising Non-Conformities, conducting RCA, CAPA and tracking closure of NCs for timely completion. Supervising and verifying preventive maintenance as per […] Read more
Ladakh’s 13 GW Solar Dream Alive, Rs. 1,080 Cr Awarded For RDSS: Power Minister Updated On Fri, Nov 22nd, 2024 by Saurenergy Read more
Ladakh’s 13 GW Solar Dream Alive, Rs. 1,080 Cr Awarded For RDSS: Power Minister Updated On Fri, Nov 22nd, 2024 by Saurenergy Union Minister of Power and Housing and Urban Affairs, Manohar Lal, reviewed the functioning of the power and housing departments during a three-day visit to Ladakh at Leh, Union Territory (UT). The minister was also briefed on the much delayed 13 GW solar plans for Ladakh, something he duly shared with the media as well. […] Read more