Woodmac Predicts Low Solar Achievement Rates for India By 2030 Updated On Tue, Jul 13th, 2021 by Saurenergy Market Research firm Wood Mackenzie (Woodmac) says that Asia Pacific solar photovoltaic (PV) capacity could triple to 1,500 gigawatts (GW) by 2030. China To Remain Leader Even as China will remain leader in the region, woodmac says low completion rates in India mean the country will miss its 100 GW solar target for 2022, […] Read more
Avaada Energy, O2 Power Win RUMSL 550 MW Solar Auction Updated On Mon, Jul 12th, 2021 by Saurenergy We have two more names joining the winners’ list in key solar auction results this week. This time, it is the RUMSL 550 MW Agar Solar park auction, where Avaada Energy and O2 Power (through Beempow energy Private Limited) have won the auction for 550 MW solar projects of Rewa Ultra Mega Solar Limited (RUMSL), […] Read more
Draughtsman for PV Solar Project – Electrical (m/f/d) Updated On Mon, Jul 12th, 2021 by Saurenergy Assemble documents packages and develop drawing sets to be reviewed by engineer. Ensure to quantify factors affecting arrangement and installation of equipment and components. Preparation of in-house drawings and explain prepared drawings. Visit proposed installation sites and draw rough sketches. Preparation of As-built drawings precisely. Quick response to the team and able to amend/modify drawings. […] Read more
President Kovind’s Childhood Home in Rural UP Goes Solar Updated On Mon, Jul 12th, 2021 by Saurenergy President Ram Nath Kovind’s residence ‘Milan Kendra’ in his native village of Paraunkh, Uttar Pradesh, has now become solarised, a move that should boost awareness about the rooftop solar industry in the region and beyond. Located 70 km away from Kanpur, the President’s childhood home is now powered by a 5 kW solar plant, which […] Read more
SECI Issues Tender for 100 MW Solar Plant in Chhattisgarh Updated On Mon, Jul 12th, 2021 by Saurenergy The Solar Energy Corporation of India (SECI) on Friday (July 9) released a tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Solar PV Project with Land having 15 years Plant O&M At Chhattisgarh. SECI had earlier issued a tender for land parcels in the state for 100 MW […] Read more