RUMSL Issues Tender For 600MW Solar Project With BESS Updated On Thu, Sep 26th, 2024 by Saurenergy The Rewa Ultra Mega Solar Limited (RUMSL) has now issued a tender seeking developers to develop a 600 MW of solar project with battery energy storage (BESS). RUMSL, formed in 2015 is a Joint Venture between Madhya Pradesh UrjaVikas Nigam Limited (MPUVN), and Solar Energy Corporation of India (SECI). As per the tender details, RUMSL […] Read more
Gujarat Plans To Add 40MW By Solarising Govt Buildings Updated On Thu, Sep 26th, 2024 by Saurenergy The Gujarat Energy Development Agency (GEDA) has now planned to add 40 MW of new solar capacities by solarising its government buildings. In its one of the recent tenders, GEDA sought bidders who can form a Joint Venture with the government to install rooftop solar on government buildings. As per the mandate, the state nodal […] Read more
4-Year Project Delay Proves Expensive For Rajasthan Solar Developer Updated On Thu, Sep 26th, 2024 by Saurenergy The Appellate Tribunal For Electricity (APTEL) bench has gone with the views of the Rajasthan Electricity Regulatory Commission (RERC) in a case (appeal no 172 of 2019) involving a solar power developer, Arjun Green Power Pvt Limited against the order of the former. Case Overview: Arjun Green Power Pvt. Ltd., a solar power developer, appealed […] Read more
JA Solar, OSW Sign 1 GW Solar Module Distribution Agreement Updated On Thu, Sep 26th, 2024 by Saurenergy JA Solar and One Stop Warehouse (OSW), an Australia-based solar distributor, signed a 1 GW solar PV module distribution agreement for the global market from 2025 to 2027. The signing ceremony for this project took place in Sydney. The agreement aims to deepen mutual collaboration in the distributed solar market across Europe, the United States, […] Read more
BluPine Commissions Its First 120 MW Solar Project In Gujarat Updated On Wed, Sep 25th, 2024 by Saurenergy Renewable energy project developer BluPine Energy today announced the successful commissioning of its 120 MW solar project in Gujarat. This project includes a 70 MW solar plant at Radhanpur and a 50 MW solar plant at Nenava, both located in the northern part of the state. The project achieved financial closure under the GUVNL 16 […] Read more
Trinasolar Unveils 645W Recyclable Module With 20.7% Efficiency Updated On Wed, Sep 25th, 2024 by Saurenergy Trinasolar recently produced a fully recycled c-Si module. The recycled PV module uses n-type TOPCon technology and has a golden-size design, with a module efficiency of 20.7% and power output exceeding 645W. The research center academy of Trinasolar developed the recycled module with its self-developed recycling technology, using materials, including silicon, silver, aluminum frames, and […] Read more
SJVN Invites Developers To Build RT Solar Projects On Gov Buildings Updated On Wed, Sep 25th, 2024 by Saurenergy SJVN has invited proposals from developers to set up 5830 kW of grid-connected rooftop solar power projects (without battery storage). SJVN is developing these on Union Government buildings across seven states, as designated by the MNRE under the PM Suryaghar scheme. These states are NCT of Delhi, Madhya Pradesh, Uttar Pradesh, Haryana, Gujarat, Maharashtra, and […] Read more
Hybrid Solar, Wind Projects To Fuel Cochin Shipyard Operations Updated On Wed, Sep 25th, 2024 by Saurenergy The Kerala government’s Energy Management Centre (EMC) has initiated plans to power Cochin Shipyard Limited (CSL) with renewable energy. To move forward with this initiative, a tender has been issued seeking consultants for the project. The last date of bid submission is September 30. Established in 1972, Cochin Shipyard Limited is a prominent shipbuilding and […] Read more
Maharashtra Launches Solarization of Lift Irrigation Updated On Tue, Sep 24th, 2024 by Saurenergy The Government of Maharashtra (GoM) has undertaken the process of solarization of Lift Irrigation Schemes that supports the agricultural regions. These regions could not be promoted through the traditional irrigation system because of geographical constraints. Furthermore, the problem of forest clearance does not permit the implementation of the traditional methods of irrigation in some region. […] Read more