Nilesh Malani Joins Waaree Group As Chief Marketing Officer Updated On Thu, Mar 7th, 2024 by Saurenergy Indian renewable energy company Waaree Group has appointed Nilesh Malani as its new Chief Marketing Officer (CMO). Before joining the Waaree Group, Malani was the Chief Marketing Officer (CMO) at Polycab. Malani also discussed his recent inclusion with the Indian green energy firm and expressed enthusiasm about his new journey. “I am happy and excited […] Read more
EV Tire-Wear Emissions 1,850 Times More Than Particulate Emissions By Petrol, Diesel Cars, Finds Study Updated On Thu, Mar 7th, 2024 by Saurenergy Electric Vehicles (EV) are causing pollution through tire-wear emissions which are 1,850 times more than particulate mass emissions caused by petrol and diesel-powered vehicles, an analysis by Emission Analytics found in its report. The added weight of these vehicles might lead to tire wear emissions that might confound the ‘zero emissions’ tag. The study was […] Read more
SECI Invites Tender For 300 MW Project At Ramagiri In Andhra Pradesh Updated On Thu, Mar 7th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has invited a tender for its proposed 300 MW (AC) ground-mounted solar PV Project at Ramagiri in Andhra Pradesh. The tender was allotted for the design, engineering, and supply of a grid-connected ground-mounted solar PV power plant (except PV modules), unloading of PV Modules at the site supplied […] Read more
Suzlon Secures 72.45 MW Order For 3 MW Series From Juniper Green Energy Updated On Thu, Mar 7th, 2024 by Saurenergy Renewable energy solutions provider Suzlon Group today announced a new order that it has secured for the development of a 72.45 MW wind power project from Juniper Green Energy Private Limited. Suzlon will install 23 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3.15 MW each at […] Read more
Centre Extends FAME-II Scheme For EVs: Report Updated On Thu, Mar 7th, 2024 by Saurenergy The Centre has decided to extend the FAME-II scheme (Faster Adoption and Manufacturing Electric Vehicles) for EV manufacturing and to boost faster adoption of EVs in the country. Earlier, the scheme was slated to end by March 31, 2024. According to media reports, the government has extended the scheme not to let any disruption affect […] Read more
LONGi, Ferroglobe Enters Long-Term Silicon Supply Agreement Updated On Wed, Mar 6th, 2024 by Saurenergy China-based solar technology company LONGi, and Ferroglobe PLC, a UK-based silicon metal and ferroalloys, producer recently entered into a long-term supply agreement. Under the terms of the agreement, Ferroglobe is expected to supply high-quality quartzite and metallurgical grade silicon (MGS) to LONGi to support its strategy to increase purchases from the leading western suppliers of […] Read more
Green Energy Projects In Rs 4,066 Crore Investment Approved By Odisha Govt Updated On Wed, Mar 6th, 2024 by Saurenergy Odisha government’s State-Level Single Window Clearance Authority has sanctioned 22 projects valued at Rs 4,066.71 Crore. These projects were approved in the 129th meeting of the State Level Single Window Clearance Authority meeting chaired by Odisha Chief Secretary Pradeep Jena. The new projects span various sectors, including Green Energy Equipment, Chemical, Textiles and Apparel, Steel, […] Read more
CERC Order Paves Way For Bundling RE With Thermal For DVC Updated On Wed, Mar 6th, 2024 by Saurenergy In an important order dated March 5 that paves the way for the signing of PPAs between Damodar Valley Corporation (DVC) on one side and ReNew Power and Avaada Energy for 500 MW of solar procurement, the Central Electricity Regulatory Commission (CERC) adopted the discovered tariffs proposed by DVC. The tariffs are notable for being […] Read more
NHPC To Establish 1200 MW Renewable Energy Park In UP Updated On Wed, Mar 6th, 2024 by Saurenergy PM Modi laid the foundation stone of the 1200 MW Jalaun Ultra Mega Renewable Energy Power Park of BSUL under NHPC Joint Venture (JV) with UPNEDA in Uttar Pradesh during a public event in Telangana on March 4. The 1200 MW Jalaun Ultra Mega Renewable Energy Power Park of BSUL (NHPC’s JV with UPNEDA) is […] Read more