PM-KUSUM Needs Recalibration To Achieve Targets: CSE Study Updated On Wed, Aug 7th, 2024 by Saurenergy A new report by Centre for Science and Environment (CSE), which focuses on gathering data and information especially from the perspective of farmers on on-ground implementation of the scheme, has offered a roadmap to help PM-KUSUM strike its targets. The report, titled Implementation Challenges of the PM KUSUM Scheme: Case Studies from Selected Indian States, […] Read more
Access To Public Finance Key To Clean Energy Adoption In India: IEA Updated On Thu, Jun 13th, 2024 by Saurenergy The International Energy Agency (IEA) recently reported an increased usage of modern renewable energy between 2010 and 2021. The United Kingdom and Indonesia have reportedly made the greatest progress in the use of modern renewables (up 9 and 7 percentage points, respectively, in total final energy consumption). The two countries were closely followed by China, […] Read more
TPREL, SJVN Sign PPA For 460 MW Firm & Dispatchable Project Updated On Sat, May 4th, 2024 by Saurenergy Tata Power Renewable Energy Limited (TPREL), has signed a Power Purchase Agreement (PPA) with SJVN Limited (SJVN), an Indian Public Sector Undertaking (PSU), for a 460 MW Firm and Dispatchable Renewable Energy (FDRE) Project. The plant, designed to meet the 460 MW FDRE requirement, integrates solar, wind, and battery storage technologies to ensure efficient energy […] Read more
PM KUSUM: Ambitions Continue to Overpower Ground Work in 2023 Updated On Fri, Dec 15th, 2023 by Saurenergy The Union Minister for New & Renewable Energy and Power R.K. Singh has informed that 2.73 lakh standalone solar pumps have been installed under PM-KUSUM as on October 31, 2023. Not surprisingly, Component A has barely seen installations, with Component C being disappointing. Component B has fared better relatively. Component A Installations Fail to Impress […] Read more
Tata Power Renewable Energy Gets LoA For Supply of 200 MW From SJVN Updated On Wed, Nov 29th, 2023 by Saurenergy Tata Power Renewable Energy Limited (TPREL), a subsidiary of The Tata Power Company Limited, has received a Letter of Award (LOA) for developing a 200 MW Firm and Dispatchable Renewable Energy (FDRE) project with SJVN Limited (SJVN). SJVN is an Indian public sector undertaking (PSU) involved in hydroelectric and renewable power generation and transmission. It […] Read more
Tata Power Renewable Energy Ltd Exceeds 1.4 GW Group Captive Projects Updated On Tue, Nov 21st, 2023 by Saurenergy Tata Power Renewable Energy Limited (TPREL), a subsidiary of The Tata Power Company Limited, has crossed the 1.4 GW capacity of group captive projects in the last seven months. This achievement, the firm maintains, is the result of signing of Power Delivery Agreements (PDA) with various industries across segments. Some of the prominent group captive […] Read more
Life Beyond PLI-Top 5 Green Schemes For MSMEs And Startups Updated On Wed, Aug 23rd, 2023 by Saurenergy If you think the Government of India has been focused on large and utility-scale renewable projects, then you are right. The government focus has undoubtedly been on putting in place a large base, be it for solar capacity building or with schemes like the Production-Linked Incentive (PLI), domestic manufacturing that rewards scale. However, for smaller […] Read more
JREDA Issues Tender To Empanel Vendors Under PM-KUSUM Updated On Mon, Aug 21st, 2023 by Saurenergy The Jharkhand Renewable Energy Development Agency (JREDA) has invited bids for the empanelment of vendors for installations of solar pumps under the PM-KUSUM scheme. The tender was meant for vendors who would be liable to design, manufacture, supply, transport, install, test and commission off-grid solar pumps. The scope of work encompasses the supply of solar […] Read more
Haryana Opens PM-KUSUM State Portal For Beneficiaries Updated On Mon, Aug 21st, 2023 by Saurenergy The Haryana New and Renewable Energy Department has opened its PM-KUSUM State Portal to collect beneficiary shares and allow the solar water pump applicants to select vendors. The portal allowed these services from August 18 and will end it on August 22. Opening the PM-KUSUM State Portal is a step in implementing the Pradhan Mantri […] Read more