REIL Tenders for Installation and O&M of Rooftop Solar Plants in Bihar Updated On Wed, Jul 29th, 2020 by Saurenergy REIL has once again issued a tender for the commissioning and maintenance of residential rooftop solar systems across various locations in Bihar. Rajasthan Electronics & Instruments Limited (REIL) has once again issued a tender for the rate contract for commissioning and maintenance of residential rooftop solar PV power systems across various locations in Bihar. The […] Read more
Haryana Tenders for Installation of Rooftop Solar With Net Metering Updated On Tue, Jul 28th, 2020 by Saurenergy Haryana has tendered for the installation of grid-tied rooftop solar plants (with/without battery banks) with net metering facility in the state. The state government of Haryana has issued a tender for the installation of grid-tied rooftop solar plants (with/without battery banks) with net metering facilities in the state. The projects will be offered on an annual rate […] Read more
Iberdrola to Launch Green Hydrogen Plant With Solar and BESS System Updated On Tue, Jul 28th, 2020 by Saurenergy Iberdrola has signed an agreement with Fertiberia to construct the largest plant to produce green hydrogen for industrial use in Europe. Spanish multinational electric utility Iberdrola has announced that it has signed an agreement with Fertiberia, which will trigger investment of 150 million euros, to construct the largest plant to produce green hydrogen for industrial […] Read more
MNRE Offers 6 Months Extension for Self Certification of Solar Inverters Updated On Mon, Jul 27th, 2020 by Saurenergy MNRE has extended the deadline for the self-certification of inverters for PV applications in the country by a period of 6 months, to December 31, 2020. The Ministry of New and Renewable Energy (MNRE) has announced that it has extended the deadline for the self-certification of inverters for PV applications in the country by a […] Read more
SECI Extends Timelines for Implementation of 97.5 MW Rooftop Solar Scheme Updated On Mon, Jul 27th, 2020 by Saurenergy SECI has extended the timelines for the implementation of the 97.5 MW rooftop solar PV systems scheme for government buildings in different zones of India. The Solar Energy Corporation of India (SECI) has extended the timelines for the implementation of the 97.5 MW grid-connected rooftop solar PV systems scheme for government buildings in different zones […] Read more
Next Intervention in Power Systems Operation is AI: POSOCO CMD Updated On Mon, Jul 27th, 2020 by Saurenergy National Grid Operator POSOCO CMD KVS Baba has said that the next great thing that POSOCO will use for demand forecasting is AI (Artificial Intelligence). National Grid Operator POSOCO CMD KVS Baba has said that the next great thing that Power System Operation Corporation (POSOCO) will use for demand forecasting is AI (Artificial Intelligence). Speaking […] Read more
Axpo Subsidiary Urbasolar to Build 37 new Solar Plants in France Updated On Sat, Jul 25th, 2020 by Saurenergy Axpo Holding has announced that its subsidiary Urbasolar is accelerating its growth in France by developing 37 new solar plants across 16 French departments Swiss utility Axpo Holding has announced that its subsidiary Urbasolar is accelerating its growth in France by developing 37 new solar plants across 16 French departments in collaboration with French bank […] Read more
MNRE Slashes Benchmark Costs for Rooftop Solar Installations Updated On Thu, Jul 23rd, 2020 by Saurenergy MNRE has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems in FY 2020-2021. The Ministry of New and Renewable Energy (MNRE) has issued a notification with the latest benchmark costs for the installation of new grid-connected rooftop solar PV systems for the present financial year […] Read more
MNRE Guidelines For Off-grid Solar Power Plants in RESCO Mode Updated On Wed, Jul 22nd, 2020 by Saurenergy The Ministry for New and Renewable Energy (MNRE) has finally issued the guidelines for the implementation of off-grid solar power packs/ plants installed in RESCO mode and through model PPA. The newly issued guidelines follow the ministry’s order in April last year that extended Off-grid and Decentralized Solar PV Applications Programme –Phase III till March 31, […] Read more