Kolkata Howrah Railway Station to Install Rooftop Solar Power Updated On Mon, May 22nd, 2017 by Saurenergy It is expected that 50 to 60 percent of the power demand at Howrah station will be met through Rooftop Solar Power. Howrah railway station is set to go green with the installation of three megawatt rooftop solar panels on platform sheds. “We are executing a three megawatt rooftop solar project for eastern railway at […] Read more
Aurangabad Municipal Corporation to Get Solar Panels on its Rooftop Updated On Tue, May 16th, 2017 by Saurenergy Solar panels will be installed on the rooftop of the main building of Aurangabad Municipal Corporation under the Centre’s Smart City scheme. Power failure disrupting the municipality’s functioning may soon be a thing of the past, as the civic body has decided to tap into solar energy at its main administrative building. D M Mugalikar, […] Read more
BPSCL is reportedly planning to set up solar park and rooftop solar panels Updated On Mon, May 15th, 2017 by Saurenergy BPSCL is working on a plan to install a Solar Power park, besides setting up rooftop solar panels in major buildings across the town Bokaro Power Supply Company Limited (BPSCL) is reportedly gearing up to increase its power production by foraying into solar energy. BPSCL is a joint venture of Steel Authority of India Limited (SAIL) and […] Read more
Smart City Surat to be Recognize with Solar Energy Award for Rooftop Plants Updated On Wed, May 10th, 2017 by Saurenergy Surat Municipal Corporation’s exemplary work in solar energy sector will be recognized by Exhibitions India group under the Smart Cities India Award-2017 for smart rooftop solar power plants on May 12. After being declared the fourth cleanest city of the country, Surat has added yet another feather in its cap. The Surat Municipal Corporation (SMC) […] Read more
SEFA Grants Us$ 1 Million to a 20 MW Off-Grid Rooftop Solar Project in Zimbabwe Updated On Wed, May 10th, 2017 by Saurenergy The African Development Bank’s Sustainable Energy Fund for Africa will support the project’s financing by funding technical feasibility work, legal advisory in regards to the preparation of key solar project agreements, as well as offering financial advisory towards developing a bankable project. The African Development Bank (AfDB)-managed Sustainable Energy Fund for Africa (SEFA) has approved […] Read more
Feed-in Tariff for Rooftop Solar Power to Be Fixed By Tamil Nadu Electricity Regulatory Commission Updated On Thu, May 4th, 2017 by Saurenergy Most of the buildings in the state use rooftop solar power units but were unable to connect to the grid and faced net-metering problems. A feed-in tariff for rooftop solar power will be fixed by the Tamil Nadu Electricity Regulatory Commission (TNERC) soon. State power utility TANGEDCO has proposed the new tariff to resolve the […] Read more
SECI Reduces Levelized Ceiling Tariff for 500 MW Rooftop Solar Power Tender Updated On Tue, May 2nd, 2017 by Saurenergy The updated Levelized Ceiling Tariff 500 MW Rooftop Solar Power Tender is lower than the previous benchmark by Rs.1.03/kWh in general category states and union territories, and lower by Rs.0.40/kWh in special category states and union territories. The Solar Energy Corporation of India (SECI) has reduced the levelized ceiling tariff for the amended 500 MW […] Read more
Himachal Pradesh Energy Development Agency Tenders 1.1 MW of Rooftop Solar Updated On Sat, Apr 29th, 2017 by Saurenergy The Himachal Pradesh Energy Development Agency 1.1 MW rooftop solar power project will consist of 50 rooftop solar systems installed on different buildings of HRTC. The Himachal Pradesh Energy Development Agency tendered 1.1 MW of rooftop solar in Himachal Pradesh. The bid-submission deadline is May 12, 2017. The entire capacity will consist of 50 rooftop […] Read more
Central Electronics Limited Tenders 3.22 MW of Rooftop Solar Power Project for Northern Railways Updated On Fri, Apr 28th, 2017 by Saurenergy The 3.22 MW rooftop solar power project will be developed under the RESCO model and the project completion timeframe is nine months. Central Electronics Limited (CEL) tendered 3.22 MW of grid-connected rooftop solar to be installed at railway workshops under Northern Railway across Indian states. The bid-submission deadline is May 26, 2017. The CEL stated, […] Read more