Renewables Under Modi. A Success Story Validated by Industry Stakeholders. Updated On Mon, May 13th, 2019 by Saurenergy Despite policy reversals and various other operational challenges faced by the industry, a bulk of the respondents are optimistic about its growth prospects. The Indian renewable industry has given a pass certificate to the five years under Modi government rule with 78 percent of the respondents in a survey of CEOs of the industry feel […] Read more
Himachal Pradesh Issues Draft Amendment Regulations For Deviation Settlement Updated On Fri, May 10th, 2019 by Saurenergy The Himachal Pradesh Electricity Regulatory Commission (HPERC) has issued draft amendments for its regulations on deviation settlement mechanism. In its notification, the commission noted that the proposed amendments have been introduced to align the state’s regulations with the Central Electricity Regulatory Commission’s (CERC) latest and fifth draft amendments to the principal deviation settlement mechanism regulation […] Read more
Renewable Capacity Growth Dips in 2018 After 20 Year Expansion: Report Updated On Mon, May 6th, 2019 by Saurenergy 2018 was the first time since 2001 that growth in renewable power capacity failed to increase year on year, a new report has revealed. New net capacity from solar PV, wind, hydro, bioenergy, and other renewable power sources increased by about 180 Gigawatts (GW) in 2018, the same as the previous year, according to the […] Read more
India’s Renewable Push On Track Despite 2018/19 Blip Updated On Fri, Apr 26th, 2019 by Saurenergy IEEFA’s briefing note, India’s electricity sector transition still on track despite a weak FY2018/19, projects renewable additions through 2021/22 based on the auction and tender activities during the past 18 months. The 2018-19 financial year turned out to be a sluggish year for both the renewable as well as thermal sectors in India in terms of increased […] Read more
Tangedco Using GPS To Get Real Time Wind Energy Data Updated On Thu, Apr 25th, 2019 by Saurenergy Tangedco has started measuring wind power generation real time with the help of GPS over the last few months. GPS system has been installed in all windmills across the state and discom has been able to measure the power generation from a windmill without going to the spot. Earlier, the discom was using an assessor […] Read more
Expanding its Global Presence, Growatt Sets Up Service Centre in Brazil Updated On Thu, Apr 25th, 2019 by Saurenergy Growatt, a leading Chinese inverter manufacturer has set up its Brazil Service Center in Mogi das Cruzes to expand its global presence. The expansion falls in line with the solar PV installations in Brazil. Solar capacity additions in the recent years have drastically increased in the South American nation, with 371.9 MW capacity added in […] Read more
Prioritise Electrification of 2 & 3 Wheeler Segment: Report Updated On Thu, Apr 25th, 2019 by Saurenergy The report brings insights and opinions from the country’s first multimodal e-mobility initiative, titled ‘Beyond Nagpur: The Promise of Electric Mobility’. A new report by the Ola Mobility Institute, a policy research and social innovation think-tank, offers insights from the shared mobility providers extensive electric vehicle operations in Nagpur to help devise business models, provide […] Read more
Tata Power Shifts Complete Focus to Renewable Energy, to Cease Building New Coal Plants: Report Updated On Wed, Apr 24th, 2019 by Saurenergy Utility ceases new coal-fired power development, creates a future based on renewables. One of the country’s largest private integrated power company, Tata Power has recently made it publicly clear that it will cease building new coal-fired capacity, according to a report released by the Institute for Energy Economics and Financial Analysis (IEEFA). The report, Tata Power: […] Read more
At a Loss For Bids, SECI Extends 3 GW Manufacturing Linked Tender Again Updated On Tue, Apr 23rd, 2019 by Saurenergy The deadline for submission has been extended from April 22, 2019, to May 14, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more